My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-006-RES WHEREAS, CITY COUNCIL DID HERETOFORE ON THE 12TH DAY OF JUNE 1995
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1996
>
1996-006-RES WHEREAS, CITY COUNCIL DID HERETOFORE ON THE 12TH DAY OF JUNE 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:31:57 PM
Creation date
4/6/2005 6:12:10 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1996
Doc Type
Resolution
CITY CLERK - Date
1/8/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />public hearing. The City must comply with applicable State and Federal <br />rules and procedures in the selection of its consultant. The selection <br />procedures to be utilized by the City must have prior approval by the <br />State and comply with 23 CFR Part 172. <br />B. The City will prepare and distribute Requests for Proposals for <br />professional engineering services for design improvements to be <br />constructed in the 19th Northwest Runoff Mitigation project. These <br />services shall include the design and preparation of construction <br />drawings, specifications and cost estimates, field surveys, an <br />environmental assessment and holding of a public hearing. <br />C. The City shall submit the completed plans, specifications and <br />estimates (P.S.&E.) to the State for review and approval. Should the <br />State determine that revisions are required to the P.S.&E., the City <br />shall make the necessary revisions. The P.S.&E. shall be developed by <br />the City's consultant in accordance with the State's latest Standard <br />Specifications for Construction of Hiqhwavs, Streets and Bridqes. <br />D. The City will submit to the State all documentation relating to <br />actual costs incurred associated with the development of the P.S.&E. <br />Reasonable costs incurred by the City after the City receives written <br />authorization by the State will be eligible for reimbursement at an <br />amount not to exceed eighty percent (80%) of the actual cost. The City <br />shall comply with the cost principles established in OMB Circular A-87, <br />"Cost principles for State and Local Governments." <br />13. FUNDING <br />A. The total construction cost for the project, including <br />contingencies, engineering and administrative costs, is estimated at two <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.