My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-024 Master Economic Development Agreement between the City, PEDC and American Spiralweld Pipe
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2018
>
2018-024 Master Economic Development Agreement between the City, PEDC and American Spiralweld Pipe
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2020 1:51:05 PM
Creation date
9/25/2018 11:29:32 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 8 7' <br />9. Millwork cabinets and countertops have lbeen included for lbreakroorns in <br />production office and Ibusiinness of areas. <br />a. Production. Offices - Allowance of $32,000.00 <br />b,. Business Office - Allowance $22,000.00 <br />10. Expansion/ control joint sealants for paving, foundations, and ("I'MIJ walls. <br />I I . Hollow mall frayes, hollow metal & wood doors with hardware for production <br />building, business office/ locker room and shipping office. <br />12. Ovedhead steel rolling doors at production'building. <br />an. 20'.-0" x 1.6'-0" OR. Coiling Doors — 22 ea <br />lb. 26".....0"' x 20'-0" O.H. Coiling Doors — 5 ea. <br />c. 12'.-0" x 89.-0'01.1. Coiling Doors - 3 ea <br />d. 20'.-0" x 60'-0" Manual Sliding Door - I ea <br />1. , Interior stud framing and drywall, ceilings, painting, floor finishes, iscellaneous <br />specialtiesfor production office/ restrooms, business office/ locker room and <br />shipping of <br />4R"evel,ei--ani dff stf <br />15. Appliance allowance for production and business office breakxoom areas. <br />16. Pre -Engineered metal buildings: <br />a. Production. Building 290,640 PE MB with roof and wall insulation. <br />b. Business Office Building - 14,400 SF PEMB with roof and wall <br />insulation. <br />IT obile/ C arta l 1bu ildinfor 1,000 SFshipping office. <br />18. Cranes at production building include: 3 -ton for maintenance, 55 -ton for coil <br />storage, 1/2 --ton jib at coil storage, I -ton at curing, I .-ton at lining and I 0 -ton, at. <br />lining. <br />19. Plumbing systems - <br />a. Production Building — Water, sewer and vent piping for officer estroorn <br />fixtures and production restrooms fixtures, floor drains., natural gas lines, <br />compressed air lines and steam, lines. <br />b. Business Office - Water, sewer and ven t. for fixtures at restrop nis, locker <br />room and breakroom. <br />c. Shipping Office — Water, sewer and vent for fixtures at restiroom. <br />20. New fire sprinkler protection system at production coating area and poly storage <br />building only. <br />2 LMechanical systerns: <br />a. Production Building - Heat and AC to production of breakroo.nv <br />restroorns, infrared tube heatand dehumidification at coating area, heat <br />and AC to coating mixing <br />room with roof top exhaust and unit heaters at <br />194,37f.' 8W)Aq 1 1 EAJIl ( I ,x1,1J1 I WWVV hM11,28Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.