My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-005-RES WHEREAS, ARK-TEX COUNCIL OF GOVERNMENTS IN COOPERATION WITH THE TEXAS NATURAL
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1996
>
1996-005-RES WHEREAS, ARK-TEX COUNCIL OF GOVERNMENTS IN COOPERATION WITH THE TEXAS NATURAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:31:57 PM
Creation date
4/6/2005 6:16:22 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1996
Doc Type
Resolution
CITY CLERK - Date
1/8/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. PROJECT COST EVALUATION (0-20 Points) <br /> <br />In the space below, provide an evaluation of the costs associated with the <br />proposed project, based on specific questions listed in the scoring criteria. <br />Please attach additional pages if needed. . <br /> <br />" <br /> <br />" <br />ii' <br /> <br />;, .....,:~~,(..<I ,.~:-,.,:..<lj~ <br /> <br />Listed below is the proposed total cost of the project. <br /> <br />We estimate that each house will require twenty-four (24) <br />loads per house for twenty-four (24) houses or 576 total <br />loads in a twelve (12) yard truck. <br /> <br />576 loads x 12 yard truck = 6,912 total yards <br />Of the 6,912 yards, we estimate 1,912 yards <br />straight to landfill because it is not suited <br />because of metal, concrete, asphalt, shingles, <br /> <br />or 27% will go <br />for tub grinder <br />etc. <br /> <br />This leaves us with 5,000 yards to grind. <br /> <br />,;, <br /> <br />5,000 yds. to grind in 20 hrs. at 250.00 per hr.- $5,000.00 <br /> <br />After tub grinder we will have 1,250 yds. left <br />that goes to landfill at $7.82 per yd. - $9,775.00 <br /> <br />Trucking the 1,250 yds. of sawdust will cost <br />$17.50 per load or 104 loads - $1,822.92 <br /> <br />The 1,912 yards that went straight to landfill <br />cost $60.00 per load or 159 loads - $9,560.00 <br /> <br />The 1,912 yards cost $7.82 per yard to go to <br />landfill -$14,'951.84 <br /> <br />Taking the 5,000 yards from 24 housing sites <br />to collection area (12 yards per load @ $60.00 <br />per load) <br /> <br />-$25,000.00 <br /> <br />Total Cost <br /> <br />$66,109.76 <br /> <br />If all 6,912 yds. had gone 6,911 x 7.82 $54,051.84 <br />straight to landfill and no 576 loads @ $60=34,560.00 <br />tub grinc!-ing it would cost-nnn------------------- $88,611. 84 <br /> <br />$22,502.08 <br /> <br />So Savings Is <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.