My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-032 Attachment-Comprehensive Plan Update
City-of-Paris
>
City Clerk
>
Ordinances
>
2011-2020
>
2018
>
2018-032 Attachment-Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 11:17:47 AM
Creation date
10/29/2018 11:16:23 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 9: PARK, RECREATION, AND OPEN SPACE PLANS <br />1. Introduction <br />In 2013, the City of Paris commissioned MHS Planning and Design, LLC to assist in developing a new <br />Parks, Recreation and Open Space Master Plan. This plan was a follow-up to Paris's 2001 Parks and <br />Recreation Master Update which had guided additions to and renovations of the park system <br />through 2013. <br />The 2013-2023 Parks, recreation and Open Space Master Plan was intended to: <br />• Provide the City of Paris with an information base to help guide decisions related to parks, <br />recreation, and open space; <br />• Assist in the implementation of those decisions and set guidelines for future park and open <br />space development; <br />• Provide feasible recommendations to the governmental body and be in accordance with the <br />desires of Paris' residents; <br />• Include all land within the City of Paris; <br />• Provide parks and open space project recommendations through 2023, and to <br />• Provide emphasis and detailed cost projections for projects recommended for <br />implementation. <br />The 2013 Parks Master Plan was updated in house and adopted by the city council in 2017 <br />(Attachment C). The intended elements as stated above for the 2013-2023 plan can remain the <br />same for the current update; these intentions have served Paris well since 2013, and will continue to <br />do so in conjunction with the elements included in the 2018-2023 update. <br />Major improvements to the Trail de Paris were completed, including a major extension referred to <br />as the West Paris Trail. A spray park was opened in cooperation with First United Methodist Church. <br />Improvements have also been made to four parks: 82 West Roadside, Lake Crook, Oak, and Wade. <br />Park improvements in the planning stage include a pump track in 2018-19, a community -built <br />playground, partnering with City Square Paris to operate a rec/community center at Oak Park, and <br />improvements to market Square and adjacent library. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.