My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-032 Attachment-Comprehensive Plan Update
City-of-Paris
>
City Clerk
>
Ordinances
>
2011-2020
>
2018
>
2018-032 Attachment-Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 11:17:47 AM
Creation date
10/29/2018 11:16:23 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1st Street <br />The current configuration of 1St Street is two south -bound lanes with: <br />• Sidewalks on both sides of the street. <br />• Parallel parking on the west side of the street between Price Street and Houston Street. <br />• Front-end angled parking around the square. <br />• Front-end angled parking on the west side of the street between Grand Avenue and Austin <br />Avenue. <br />• Parallel parking on the east side of the street between Austin Avenue and Sherman Street. <br />The proposed retrofit for 1St Street includes: <br />• Bulbouts at each intersection and where appropriate along the corridor. <br />• 8'-0" parallel parking on the west side of the street. <br />• A 23'-0" travel way that includes one -travel lane in each direction. <br />• A 5'-0" planting strip, with curb, to provide separation for the separated bicycle facility. <br />• A 10'-0" separated bicycle facility that is at street level. <br />Should the finances become available for a more robust cross-section, it should include: <br />• Valley gutters between the on -street parking row and the travel way, and <br />• A sidewalk -level separated bicycle facility. <br />Figure 5: 15` Street: Existing, Proposed with Retrofit and Full Build -out. <br />1St Street was identified as the primary street for a separated bicycle facility due to having a larger curb - <br />to -curb cross-section than Main Street, and minimal impacts to business due to existing curb -cuts and <br />parking. Trail access to the Northeast Texas Trail, topography, and access to the Market Square Farmers <br />Market were also considerations. <br />Main Street <br />The current configuration of Main Street is two north -bound lanes with: <br />• Sidewalks on both sides of the street. <br />• Parallel parking on the east side of the street between Price Street and Houston Street. <br />• Front-end angled parking around the square. <br />• Parallel parking on the east side of the street between Grand Avenue and Austin Avenue. <br />• Parallel parking on the east side of the street between Austin Avenue and Sherman Street. <br />The proposed retrofit for Main Street includes: <br />0 Bulbouts at each intersection and where appropriate along the corridor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.