Laserfiche WebLink
<br />.- <br /> <br />7.4 <br /> <br />7.5 <br /> <br />7.6 <br /> <br />7.7 <br /> <br />studies or similar information or data are, Dr will be, required by CONTRACTOR for such <br />purposes. <br /> <br />CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing Underground Facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of all Underground Facilities, <br />whether indicated in the Contract Documents, or not. No additional examinations, <br />investigations, explorations, tests, reports, studies or similar information or data in respect of <br />said Underground Facilities are, or will be, required by CONTRACTOR in order to perform <br />and furnish the Work at the Contract Price, within the Contract Time and in accordance with <br />the other terms and conditions of the Contract Documents. <br /> <br />CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br /> <br />CONTRACTOR has given ENGINEER written notice ofall conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENGINEER is acceptable to CONTRACTOR. <br /> <br />CONTRACTOR has reviewed and fully agrees to the limitation of liability provisions included <br />in the Supplementary Conditions. <br /> <br />Article 8. CONTRACT DOCUMENTS <br /> <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the Work consist of the following: <br /> <br />8.1 This Agreement <br /> <br />8.2 Bid and Bid Schedule, Advertisement, and Information or Instructions to Bidders. <br /> <br />8.3 Performance and Payment Bonds <br /> <br />8.4 Notice of Award and Notice to Proceed <br /> <br />8.5 General Conditions and modifications thereto, ifany, such are included. <br /> <br />8.6 Supplementary Conditions <br /> <br />8.7 Technical Specifications prepared or issued by Hayter Engineering. Inc., dated July, ~ 996 <br /> <br />8.8 Drawings, consisting of sheet~,"numbered --L through -..2.L, inclusive with each sheet <br />bearing the following general title: <br /> <br />Wastewater Treatment Plant Improvements <br />Clarifier and Sludge Processing Facilities <br /> <br />22 <br />