My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-117-RES WHEREAS, CITY COUNCIL DID IN RESOLUTION NO 95-116 ON OCTOBER 9, 1995 APPROVE
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1995
>
1995-117-RES WHEREAS, CITY COUNCIL DID IN RESOLUTION NO 95-116 ON OCTOBER 9, 1995 APPROVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:32:10 PM
Creation date
4/7/2005 1:06:13 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1995
Doc Type
Resolution
CITY CLERK - Date
11/9/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in paragraph 4.2 of the General Conditions, and accepts the <br />determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the <br />technical data contained in such reports and drawings upon which CONTRACTOR is entitled to <br />reply. <br /> <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, explorations, tests, <br />reports and studies (in additions to or to supplement those referred to in paragraph 7.2 above) <br />which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise <br />may affect the cost, progress, performance or furnishing of the Work at the Contract Price, <br />within the Contract Time and in accordance with the other terms and conditions of the Contract <br />documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and <br />no additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data are or will be required by CONTRACTOR for such purposes. <br /> <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract documents with respect to existing Underground Facilities at or contiguous to the <br />site and assumes responsibility for the accurate location of said Underground Facilities. No <br />additional examinations, investigations, explorations, tests, reports, studies or similar information <br />or data in respect of said Underground Facilities are or will be required by CONTRACTOR in <br />order to perform and furnish the Work at the Contract Price, within the Contract Time and in <br />accordance with the other terms and conditions of Contract Documents, including specifically the <br />provisions of paragraph 4.3 of the General Conditions. <br /> <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br /> <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br />discrepancies that he has discovered in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br /> <br />Article 8. CONTRACT DOCUMENTS. <br /> <br />The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR <br />concerning the Work consist of the following: <br /> <br />8.1 This Agreement (pages 1Z to ~ inclusive). <br /> <br />8.2 Exhibits to this Agreement (pages <br /> <br />to _' inclusive.) <br /> <br />8.3 Performance and other Bonds, identified as exhibits <br />pages. <br /> <br />and consisting of <br /> <br />8.4 Notice of Award. <br /> <br />8.5 General Conditions (pages 30 to 58 inclusive). <br /> <br />8.6 Supplementary Conditions (pages 59 to...11.L inclusive). <br /> <br />8.7 Specifications bearing the title Booker T. Washinaton Area Curb and Gutter Pavino and <br />Drainaoe Phase III and consisting of~ divisions and 169 pages, as listed in table of <br />contents thereof. <br /> <br />8.8 Drawings, consisting of a cover sheet and sheets numbered -L- through ~ inclusive <br />with each sheet bearing the following general title: Booker T. Washington Area Curb and Gutter, <br />Paving and Drainage, Phase III. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.