Laserfiche WebLink
<br />construction of the Project. The City will not let the construction <br />contracts until all environmental mitigation issues have been addressed. <br />The City shall provide to the State written certification from the <br />appropriate regulatory agency(s) that all environmental problems have' <br />been remedied. <br />B. All costs associated with the remediation of the environmental <br />problems shall be the responsibility of the City and/or the property <br />owners. These costs will not be reimbursed or credited towards the <br />City's financial share of the Project. <br />12. ENGINEERING SERVICES <br />A. The City will prepare or cause to be prepared the preliminary <br />engineering necessary for the development of plans, specifications and <br />estimates (P.S.&E.). Development of the preliminary engineering shall <br />include environmental assessment and holding of a public meeting and/or <br />public hearing. The City must comply with applicable State and Federal <br />rules and procedures in the selection of its consultant. The selection <br />procedures to be utilized by the City must have prior approval by the <br />State and comply with 23 CFR Part 172. <br />B. The City will prepare and distribute Requests for Proposals for <br />professional engineering services for design improvements to be <br />constructed in the 19th Northwest Runoff Mitigation project. These <br />services shall include the design and preparation of construction <br />drawings, specifications and cost estimates, field surveys, an <br />environmental assessment and holding of a public hearing. <br />C. The City shall submit the completed plans, specifications and <br />estimates (P.S.&E.) to the State for review and approval. Should the <br />State determine that revisions are required to the P.S.&E., the City <br />shall make the necessary revisions. The P.S.&E. shall be developed by <br />-7- <br />