Laserfiche WebLink
<br />Attachment to Change Order No.1 <br />Paris, Texas - Water Treatment Plant Expansion <br />Vol. I - Expansion <br /> <br />Under the terms of the above referenced contract, the following modifications in the scope of <br />work are hereby submitted. <br /> <br />DESCRIPTION <br /> <br />PRICE GIANGE <br /> <br />1. Relocate the 24" Butterfly Valve 11V-104 from <br />its current location to the proposed location <br />in the existing 24" Filtered Water Line adjacent <br />to the 500,000 gallon Clearwell as detailed by <br />letter dated January 26,1995 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Add $8,627.30 <br /> <br />2. Add 16-Ft gate at the West Chemical Building as <br />detailed by letters dated December 19, 1994 <br />and January 27,1995 ........................................ Add $831.20 <br /> <br />3. Replace the Existing Lime Feed Equipment with <br />the new equipment from Stanco Projects, Inc. as <br />detailed by letter dated January 27, 1995 ........................ Add $11,602.35 <br /> <br />4. Provide three (3) 2 inch Chlorine Corporation <br />Stops and Quills as detailed by letter dated <br />January 27,1995 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Add $1,059.15 <br /> <br />5. <br /> <br />Additional waterline installation at Lime-Carbon <br />Silos as detailed by Letter dated January 27, 1995. <br /> <br />Add $1,961.98 <br /> <br />6. Delete proposed handrails between sedimentation basin <br />1 and 2 and between basins 3 and 4 (680 LF) <br />Relocate two (2) safety chains to entrances from the <br />flocculation area to the sedimentation basin walkway. <br />The safety chains were previously located at the east <br />end of the sedimentation basin walkway. <br /> <br />Relocate proposed handrail to replace existing handrail <br />previously to remain on the existing sedimentation <br />basins (240 LF). <br /> <br />Relocate proposed handrail to replace existing handrails <br />previously to remain on the filters. Add one (1) <br />safety chain at entrance of the proposed stairs on the <br />filters (90 LF) . . <br /> <br />Net deduction of handrail is 350 LF <br /> <br />. . . . . . . . . . . . . . . . . . . Deduct $9,105.70 <br />