My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-161-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 88-046
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1994
>
1994-161-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 88-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:32:35 PM
Creation date
4/7/2005 2:36:47 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1994
Doc Type
Resolution
CITY CLERK - Date
12/12/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Policies Act of 1970, Title 42 U.S.C.A. Section 4601, et seq., except those <br /> <br />provisions relating to incidental expenses incurred by the property owners. <br />Documentation to support such compliance must be maintained and must be made <br />available to the State and its representatives for review and inspection. <br />The City shall also secure and provide the State all easements over any other <br />land in addition to normal right-of-way as may be required for the construction <br />of the Project. <br />4. UTILITY ADJUSTMENTS/RELOCATIONS <br />If required for the completion of the Project, the City shall provide and assume <br />the cost for utility adjustments or relocations which may be located within the <br />Project limits. All utility adjustments or relocations shall conform to the <br />State's Utility Accommodation Policy, as established in Title 43 TAC Chapter 21. <br />5. ENGINEERING DEVELOPMENT <br />The State shall be responsible for the preparation of the Project's preliminary <br />engineering necessary for the development of the plans, specifications and <br />estimates (P.S.& E.). The P.S.& E. shall be developed in accordance with the <br />State's 1993 Standard Specifications for Construction of Hiqhwavs. Streets and <br />Bridqes or its currently approved revisions. The State shall submit a copy of the <br />completed P.S.& E. to the City for review. <br />6. CONSTRUCTION REQUIREMENTS <br />A. The State shall advertise for construction bids, issue bid proposals, receive <br />and tabulate the bids and award a contract for construction of the Project in <br />accordance with existing procedures and applicable laws. Any field changes, <br />supplemental agreements or additional work orders which may become necessary <br />subsequent to the award of the construction contract shall be subject to the <br />approval of the State. <br />,B. The State will supervise and inspect all work performed by the construction <br />contractor and will provide such engineering, inspection and testing services as <br />may be required to ensure that the construction of the Project is accomplished <br />in accordance with the approved P.S.& E. The City shall have the right, at its <br />own costs, to observe the construction of the Project, provided that such <br /> <br />t <br /> <br />12/02/94 <br /> <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.