Laserfiche WebLink
<br />. <br /> <br />CONTRACT TIME <br />The CONTRACTOR will commence the work required by the Contract Oocuments on <br />the date indicated on the Notice to Proceed and will complete the work within <br />90 calendar days unless the period for completion is extended in <br />accordance with the Contract Documents. If the Contractor does not complete <br />the work within the specified time, the CONTRACTOR agrees to pay as liquidated <br />damages the sum of S 250.00 , for each calendar day thereafter until <br />the work is completed in accordance with the Contract Documents. <br /> <br />CONTRACT PRICE <br />The CONTRACTOR agrees to perform all the work described in the Contract <br />Documents not to exceed the sum of S <br />, as described in the proposal as base bid <br /> <br />and <br /> <br />(additive alternate(s) as appropriate) <br /> <br />CONTRACT DOCUMENTS <br />The term "Contract Documents" means and i ncl udes the fo 11 owi ng whi ch are <br />incorporated herein by reference as if fully reproduced: <br /> <br />I <br />I <br />L <br />I <br /> <br />A. Pre-Bid Information <br />(List Table of Contents of Contract Documents) <br />B. Instructions to Bidders <br /> <br />C. Bid Forms <br /> <br />D. Agreement Between Sponsor and Contractor <br /> <br />E. Bonds and Certificates <br /> <br />F. General Provisions <br /> <br />G. Supplementary Conditions <br /> <br />H. General Project Requirements <br /> <br />I. Drawings Index <br /> <br />J. Addenda <br /> <br />K. Technical Specifications <br /> <br />I <br /> <br />L. <br />M. <br />N. <br />O. <br /> <br />Drawings prepared by <br />numbered 1 <br /> <br />Bucher, Willis & Ratliff <br />through 7 dated 10-24-94 <br /> <br />Page 2 of 6 <br /> <br />i"'- <br />