Laserfiche WebLink
<br />180012-28 <br /> <br />." <br /> <br />.. <br /> <br />CHANGE ORDER <br /> <br />. <br /> <br />Order No. <br /> <br />One <br /> <br />Date: <br /> <br />October 7, 1994 <br /> <br />Agreement Date: December 17, 1993 <br /> <br />NAME OF PROJECT: Paris Booster Pump Station <br />92 WSRB 01-93 <br /> <br />OWNER: <br /> <br />City of Paris, Texas <br /> <br />CONTRACTOR: <br /> <br />Oscar Renda Contracting <br /> <br />The following changes are hereby made to the CONTRACT DOCUMENTS: <br /> <br />The contract price will be increased to cover the additional expense of <br />.. . changing the connection of the new 42" line to the existing at Campbell Soup. <br />JustlflcatlOn: Original documents showed existing utilities to be in a different location <br />than was actually constructed. This caused a conflict in pipe location. <br /> <br />Change to CONTRACT PRICE: <br />Original CONTRACT PRICE <br /> <br />$ 2.080.000. 00 <br /> <br />Change to .CONTRACT TIME: <br />The CONTRACT TIME will be [increased] (lOOfJOOWllli1) by 30 <br /> <br />calendar days. <br /> <br />. The date for completion of all work will be Januarv 1 ~. 199~ <br /> <br />(Date). <br /> <br />Approvals Required: <br />To be effective this Order must be approved by the Federal agency if it changes the <br />scope or objective of the PROJECT. or as may otherwise be required by the SUPPLE- <br />MENTAL GENERAL CONDITIONS. <br /> <br />Requested by: <br /> <br />Recommended by: <br />Hayter Engineering, Inc. <br /> <br />Ordered by: <br /> <br />City of Paris <br /> <br />Accepted by: <br />Oscar Renda Contracting <br />Federal Agency Approval (where applicable) Not applicable <br /> <br />CONTRACT DOCUMENTS FOR CONSTRUCTION OF <br />FEDERALLY ASSISTED WATER AND sewER PROJECTS <br /> <br />EXHIBIT A <br /> <br />Docum.". No. 10 <br />Change Order: Page , or 1 <br />