Laserfiche WebLink
<br />CHANGE ORDER <br /> <br />Order No. <br /> <br />Three <br /> <br />Date: <br /> <br />August 22, 1994 <br /> <br />Agreement Date: <br /> <br />July 12, 1993 <br /> <br />NAME OF PROJECT: <br /> <br />36" Raw Water Transmission Main <br /> <br />Job No. 92 WSRB 02-92 <br /> <br />OWNER: <br /> <br />City of Paris <br /> <br />CONTRACTOR: <br /> <br />Kenko, Inc. <br /> <br />The following changes are hereby made to the CONTRACT DOCUMENTS: <br /> <br />justification: <br /> <br />1. Furnish and install replacement check valve for raw water <br />pump #4 discharge piping. <br />2. Furnish and install 2 EA 3 valve manifolds for high and low <br />pressure lines connecting to two differential pressure transmitters. <br /> <br />Change to CONTRACT PRICE: <br />Original CONTRACT PRICE <br /> <br />$ 3,657,005.80 <br /> <br />Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 3.677.765.11 <br /> <br />The CONTRACT PRICE due to this CHANGE ORDER will be (increased) ~~ <br />by: $ 7,433.69 <br />The new CONTRACT PRICE including this CHANGE ORDER will be $ 3.685.198.80 <br />Change to CONTRACT TIME: <br /> <br />The CONTRACT TIME will be ~ (decreased) by 4') <br /> <br />calendar days. <br /> <br />The date for completion of all work will be October 16. 1994 (Date]. <br /> <br />Approvals Required: <br />To be effective this Order must be approved by the Federal agency if it changes the <br />scope or objective of the PROJECT. or as may otherwise be required by the SUPPLE- <br />MENTAL GENERAL CONDITIONS. <br /> <br />Requested by: <br /> <br />KENKO, INC. <br />Recommended by' <br />. HAYTER ENGINEERING, INC. <br /> <br />O,d".d by ~ ~ <br />Accepted by: ~ ~.. . <br />CI 0 PARI <br />Don Shelton, Mayor <br />Federal Agency Approval (where applicable] <br /> <br />CONTRACT DOCUMENTS FOR CONSTRUCTION OF <br />FEDERALl.Y ASSISTED WATER AND SEWER PROJECTS <br /> <br />Document No. 10 <br />Change Order: Page 1 of , <br /> <br />EXHIBIT A <br />