My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Wastewater Treatment Plant Engineering Services
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2019
>
06 - JUNE
>
June 10
>
11 - Wastewater Treatment Plant Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2019 9:34:45 AM
Creation date
6/6/2019 11:53:02 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A — PHASE 1 SCOPE OF SERVICES <br />General <br />Generally, the Scope of Services includes professional services necessary for the evaluation of <br />improvements to the City of Paris Wastewater Treatment Plant (WWTP). <br />The planned capital improvements include modification and refurbishment of existing facilities as well as <br />construction of new facilities to meet the targeted capacity and treatment criteria for the existing WWTP. <br />The evaluation will generally include the following items: <br />Evaluate rehabilitation of the existing plant to 7.25 MGD: <br />• Hydraulic capacity of the WWTP Annual Average Design of 7.25 MGD. <br />• Potential phasing of the capacity of the facility less than 7.25 MGD. <br />• Planning for identified future regulations as related to future phosphorus removal. <br />• New influent pump station. <br />• New headworks facility with fine screening and grit removal with screenings and grit <br />processing with loading. <br />• New primary clarifier flow splitter structure. <br />• New primary clarifiers. <br />• New secondary treatment splitter structures. <br />• New conventional activated sludge basins. <br />• New secondary clarifiers. <br />• Rehabilitation or repurposing of the chlorine system. <br />• New RAS/WAS pump station. <br />• Utilization of structures for new aerobic digesters. <br />• Rehabilitation and expansion of solids thickening facilities. <br />• Rehabilitation and expansion of solids dewatering facilities. <br />• New electrical service facilities. <br />• New plant water system. <br />• New backup power generator system. <br />• New SCADA system. <br />1. Funding Assistance <br />Garver will assist the City with pursuit of funding through one funding source, the Texas Water <br />Development Board (TWDB). Garver cannot guarantee that funding for this project will be available <br />or that the City will be successful in qualifying for such. Garver will perform the following tasks: <br />• Coordinate with the Texas Water Development Board via telephone to discuss funding <br />options available for the project. <br />• Review the Cities Intended Use Plan for submittal and comment. <br />• Complete the Project Information Form (PIF) to TWDB funding through the Clean Water <br />State Revolving Fund (CWSRF) program. When requested, the City will be responsible for <br />providing necessary data to Garver to complete the form. <br />• Upon acceptance of the PIF, Garver will assist the City with completing the CWSRF loan <br />application. <br />• Draft resolution, if required. <br />• Attend one pre -application meeting with the City at the TWDB headquarters in Austin, Texas. <br />• Includes one meeting to present options to council, if required. <br />Appendix A - Scope of Services 1 of 5 <br />City of Paris WWTP Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.