Laserfiche WebLink
<br />SEP-08-1'394 14: 37 FRm1 BWR-DALLAS. r< <br /> <br />TiJ <br /> <br />PAR I '3-EARL P . 05 <br /> <br />AGREP:MENT <br /> <br />TIllS AGREEMENT is dated as of the 12th day of September in the year 1994 by and between City of <br />Paris, Pari5, Texas, (hereinafter called OWNER) and Archer-Western ContrActors, LTD. (hereirudrer <br />called CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set lorth, agree as <br />follows: <br /> <br />Article 1. <br /> <br />. WORK <br /> <br />CONTRACTOR shall complete all Work as specified Or indicated in the Contract Documents. The Work <br />is generally described as follows: <br /> <br />Water Treatment Plant Expansion. <br />VOL. I . EXPAt'iSION <br /> <br />The Project for which tbe Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br /> <br />Construction of plant expansion facilities from its,current capacity of 18 milllon gallons per day <br />(MGD). 10 a total of 36 MGD including two additional tloC<.:ulation-sedimentation basins, four <br />dual-media filters, filter gallery. bulk chemical feed facilities, three 5.600 gpm treated water <br />tr'Ullifer pumps, rehabilitating the two existing 1l0cculation-sedimentation basins and si-.: existing <br />tlIters and related Sitework. roadways and buildings, together with piping and all necessary <br />appurtenances, and shall complete interface, be connected with. and function and be cnmpJete and <br />ready to operate with computer ba;;ed controls and instrumentation system included as part of <br />another contract: Water Treatment Plant Expansion, YOLo Tl . CONTROLS AND <br />INSTRUMENTATION. <br /> <br />Article 2. <br /> <br />ENGINEER <br /> <br />The Proje<.1; has been designed by City Engineer. City of Paris, Paris. Texas, or his authorized <br />representative, who is hereinafter called ENGINEER and who is to act as OWNER'S representative. <br />assume all duties and responsibilities and have the righls and authority assigne<l to ENGINEER in the <br />Contrat Documcius in connection with completion of the Work in accordance with the Contr:lCt <br />Documents. <br /> <br />Article 3. <br /> <br />CONTRACT TIME <br /> <br />3.1 The Work. for the new construction will be substantially completed within 365 calendar days and <br />!he work for the rehabilitation of !he existing filters and existing tloc~"1llation/sedimentation basiD.~ <br />will be substantially complete in an addition 180 days after the cIate when the Contract Ttmc <br />commences to run as provided in paragraph 2.3 of the Generdl Conditions. and completed and <br />ready fOr final payment in accordance with paragraph 14.13 of General Conditions within 580 <br />calendar da).s from the date when the Contrll(,t TIme commences to run. <br /> <br />3.2 Liquidated Damages <br /> <br />EXHIBIT A <br />