Laserfiche WebLink
McInnis Brothers Construction, Inc. <br />119 Pearl street <br />Minden, LA 71056 <br />PARTIAL PAYMENT REQUEST <br />Pay Request No. 14 <br />From: 6/1/2019 <br />To: <br />6/30/2019 <br />Name of Owner: City of Paris <br />Owner's Address: P.O. Box 9037, <br />Paris, TX 75461 <br />Engineer: Hayter Engineering, Inc. <br />Engineer's Address: 4445 SE Loop 286, Paris, TX 75460 <br />Project Name: Flow EQ Basin <br />Barsereen <br />Project Number: HEI #180070 <br />Contract Price (Including Change Orders): $1,038,414.13 <br />Item No..., <br />m,...... ..... µ........ ..r .m.... - e Ori in.. <br />g al Bid <br />Description of Item <br />_ _ , .. w........ ...... m.., .., <br />Unit of Original Bid Quantity <br />Completed <br />. ......... <br />Quantity Total <br />Completed Quantity <br />...... ..__..... .. <br />Total Value <br />Quantity <br />Measure Unit Price This Month <br />Previously Completed <br />Completed <br />1 <br />Mobilization ......_-. j...... <br />LS 60 000.00 0.00 <br />1 1, 00 <br />SO.00O.OD <br />Barecree n &Concrete diversion structure, <br />., <br />------ ___ <br />Including gates and stop gates, stairs and <br />platform, handrals, grating, transducer 1 <br />LS 352,862.00 0.00 <br />1.00 1.00 <br />352,882.00 <br />supports, excavation and connection to <br />inlet <br />���cendmoueet 'l i" <br />3 <br />......_.._.caw <br />mmmechanicat barscreen, 2 ultrasonic <br />n"Vers and 1 Boat 1 <br />LS 300,000.00 0.00 <br />1.00 1.00 <br />300,000.00 <br />316 SS washer and compactor with flexible_0...._w <br />4 <br />transition chola 1 <br />LS 8Q000.00 0.00 <br />1.00 1.00 <br />80,000.00 <br />--- <br />_ _ P',. <br />Lidctnc&pl 1 _ <br />-0 <br />LS 25 OOD.00 0 00 <br />.. _A <br />1 00 100 <br />. <br />25 00�,Oq <br />Site work, including erosion control, <br />, __.! -A..�... <br />_...... <br />- _ <br />8 <br />1 <br />0redln0 oulvertsand drainage„ <br />LS 20,000.00 0.00 <br />1.00 1.00 <br />20,000.00 <br />Yard piping, including 36" and 42" PVC <br />1 <br />sewer line, fittings, 1/2" and 2" PVC water <br />LS 80,000.00 0.00 <br />1.00 1.00 <br />80,000.00 <br />7 <br />Imes, backeow rp eventerand yard hdrants. <br />._.. <br />8 <br />,,.-- -- - <br />Concrete driveway, including curb, 398 <br />earthwork, and retainin walls <br />- _... .., ,... .....- ----------- _.-., -. <br />syd 100.00 0.00 <br />......... _.._... <br />398.00 398.00 <br />39,800.00 <br />9 <br />_._ <br />8 to man roof chs, link <br />_ <br />m Ift 40 00 0.00 <br />34.00 34.00 <br />1,360.00 <br />tell g ate 1 <br />- <br />ea 3x000 00 <br />p <br />� 00 1 00 <br />3000.00 <br />, <br />Replace stop gates n existing diversion <br />1� <br />structu8, <br />re <br />LS 40,000.OD 0.00 <br />1.00 1.00 <br />40,000.00 <br />12 --_..e <br />handralis xlsm dlverslon_ <br />C3retivt & ... . _._.. <br />O <br />�.. <br />-........ <br />Q.. <br />14 <br />'O <br />0 <br />m.. . _._0 .� <br />00.00 <br />Fencing 361 <br />lft 5 000 <br />361 00 67 00 <br />18805.00 <br />Re <br />move and dispose <br />p existing sewer <br />m _ v_0.00, _ <br />, „ , _ <br />�'"" <br />livres and manholes after new concrete 1 <br />LS 5,000.00 0.00 <br />1.00 1.00 <br />5.000.00 <br />15 <br />ce <br />structure Is mlrleted <br />16 <br />i' mmm . . <br />Materials lesLp: 1 <br />..... <br />m. , w, ..,,,,,, <br />LS 7 353 00 0.00 <br />1 00 <br />. . <br />7 353 00 <br />rder 1 <br />21414 13 <br />-'1"66 <br />1 00 00 <br />TOTALS ._.... .... .......... _ _.-' <br />LS <br />- _0.00 „..... <br />-1 <br />.....:1,036 <br />43 <br />%%lil <br />Completed to Date: <br />$1,038,414.13 <br />,or <br />� OF Tei <br />Stored Material: <br />$322,611.47 <br />��(Q .- "' "' •: �S ��, <br />* ` Completed <br />Materials Installed <br />and Stored to Date <br />$322,611.47 <br />$1,038,414.13 <br />Less 6% Retsinage: <br />$0.00 <br />;.....•/ <br />Less Previous Payments: <br />$986,493.42 <br />' <br />KEV IN R. VANHOOZIER Amount Due This Application: <br />$61,920.71 <br />.... ...................y <br />of Work 'r�tjl3r�oMrs n appxeo on amount to discharge contractors ""male otdrgaeore <br />cauractor mrttlies Ilial to me beat of its knomedpe 1) all premus progress payments received hom Omer SWIS-oso.1wo <br />i.ed in connection with Work coveted by prior Applications for Payment. 3) life of ell Work materials and Ar"Mor Udl Wa 0110 to a covered by this Application for Payment vef pass to gvmer at lane of <br />free earn ria eactm interests <br />payment <br />by this Application <br />Appfand <br />mei encumbrances except as are mums <br />fa Payment Is ir accordance with the Contract Oocumenls by a <br />h not tlefectrve. <br />sto�vnv1 any suU, <br />Cleric sepmlY interest or ances <br />31 oris covefetl <br />. ... <br />�G <br />µH <br />r y N A <br />@ M1snd <br />4d <br />0 <br />Engineer <br />Signature and Date:14�.� <br />, <br />Owner Signature and Date <br />Contractor Signature and Date 4 w m m mm mi <br />w� • <br />_ ._........ <br />...... ,... ..... n <br />On -Site Observer Signature and Date: <br />