Laserfiche WebLink
<br />d. Prepare preIiminary construction drawings of the proposed improvements to the <br />existing guidance sign system plan in accordance to the existing FAA approved <br />Guidance Sign System Plan. <br /> <br />Construction Plans will include: <br /> <br />Title Sheet <br />Existing Airport Layout Plan <br />Estimated Quantity Sheet <br />Guidance Sign System Plan Sheets <br />Electrical Details and Notes <br />Signage Detail Sheets <br />Suggested Construction Sequence <br /> <br />e. Prepare preIiminary construction document/specifications for the PROJECT. <br /> <br />f. Calculate probable construction quantities. <br /> <br />g. Prepare engineer's opinion of probable construction costs. <br /> <br />h. Furnish CITY two (2) sets and TxDOT, Division of Aviation two (2) sets of Preliminary <br />Construction Plans and Specifications for review and comments. <br /> <br />2. FINAL DESIGN <br /> <br />a. Attend meeting with CITY to review Preliminary Construction Plans and Specification <br />review comments received from CITY and TxDOT. <br /> <br />b. Finalize Construction Plans and Contract Documents/Specifications incorporating final <br />review comments. <br /> <br />c. Resubmit Final Plans and Contract Documents/Specifications to CITY for final review. <br /> <br />d. Prepare bidding documents. <br /> <br />3. BIDDING PHASE <br /> <br />a. Assist CIlY in advertising for bids. <br /> <br />b. Print and distribute Plans and Contract Documents/Specifications to plan holding <br />houses and prospective bidders. <br /> <br />c. Respond to contractor's questions regarding plans, specifications and bidding <br />documents. <br /> <br />d. Attend Bid Opening at City Hall. <br /> <br />2 <br />