My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-068-RES WHEREAS, the City of Paris has identified damages caused by flood water erosion which must be
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1993
>
1993-068-RES WHEREAS, the City of Paris has identified damages caused by flood water erosion which must be
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:32:48 PM
Creation date
4/8/2005 7:50:08 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1993
Doc Type
Resolution
CITY CLERK - Date
7/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT NO. <br /> <br />STATE_______________________________ <br /> <br />UNITED STATES DEPARTMENT OF AGRICULTURE <br />SOIL CONSERVATION SERVICE <br /> <br />PROJECT AGREEMENT <br /> <br />THIS AGREEMENT, made this _!~~~ day of __~~!~_______, 199~, by and <br />between the City of___tq~i~____, Sponsor, and Contracting Local <br />Organization, called the City; and the Soil Conservation Service, United <br />States Department of Agriculture, called SCS. <br /> <br />WITNESSETH THAT: <br /> <br />WHEREAS, under the provision of the Title IV of the Agricultural <br />Credit Act of 1978, Public Law 95-334, the City and SCS agree to a plan <br />which provides for restoration of certain works; <br /> <br />NOW THEREFORE, in consideration of the premises and of the several <br />promises to be faithfully performed by the parties hereto as set forth, the <br />City and SCS do hereby agree as follows: <br /> <br />A. It is agreed that the following-described work is to be performed at an <br />estimated cost of $28,788.40 <br /> <br />Site 4-4 Phase 1 - <br /> <br />Removal of silt from channel bottom. <br />grading and placement of Rock Rip-Rap <br />and side slope of existing ditch. <br /> <br />Shaping, <br />on bottom <br /> <br />B. The City will: <br /> <br />1. Provide 20 percent of the cost of constructing works of improvement <br />in A. This cost to City is estimated to be $5,697.10 <br /> <br />2. Install the works of improvement described in A by Force Account in <br />accordance with specifications furnished by SCS and specifications <br />furnished by the City when concurred in by the Assistant State <br />Conservationist (Adm). <br /> <br />3. Provide certification (sign SCS-ADS-78) with accompanying attorney's <br />opinion that real property rights have been obtained for performing the <br />items of work described in ~. <br /> <br />4. Accept all financial and other responsibility for excess costs <br />resulting from its failure to obtain, or its delay in obtaining, <br />adequate land and water rights, permits, and licenses needed performing <br />the work described in A. <br /> <br />5. Appoint a Contracting Officer, and an authorized representative who <br />shall have authority to act for the Contracting Officer, listing their <br />duties, responsibilities, and authorities. Furnish such information in <br />writing to the Assistant State Conservationist (Adm). <br /> <br />EXHIBfT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.