Laserfiche WebLink
<br />" <br /> <br />Paragraph 4 of the watershed agreement is changed to read: <br /> <br /> Sponsoring Estimated <br />Works of Local Engineering <br />ImDrovement Orcranization SCS Service Cost <br /> (percent) (percent) (dollarsl <br />Lake Crook <br />Modification 0 100 20,300 <br />Basic Fish and <br />Wildlife Facilities 100 0 8,200 <br />15 Floodwater Retarding <br />Structures 0 100 329,200 <br />7.06 miles of Channel <br />Work 0 100 60,500 <br />4 Grade Stabilization <br />Structures 0 100 48,200 <br /> <br />All other terms, conditions, and stipulations of the watershed <br />agreement not modified here remain the same and are agreed to: <br /> <br />Signed: <br /> <br />President <br /> <br />c{ff:ffl17~/ <br /> <br /> <br />Don Shelton, Mayor Pro Tem <br /> <br />State Conservationist <br />Conservationist <br /> <br />Lamar Count v WCID No.3 <br />Sponsor <br /> <br />Date <br /> <br />Lamar Soil and Water <br />Conservation District <br />Sponsor <br /> <br />Date <br /> <br />Lamar Co. Commissioners <br />Court <br />Sponsor <br /> <br />/'1./ t. /9} <br />Date . <br /> <br />Citv of Paris <br />Sponsor <br /> <br />Date <br /> <br />Soil Conservation Service <br />USDA: SCS <br /> <br />Date <br />