Laserfiche WebLink
<br />PART 3: <br /> <br />AGE OF THE WASTEWATER TREAHlENT FACILITIES <br /> <br />A. ~hat year was the wastewater treatment plant constructed or last <br />major expansion to increase the hydraulic capacity of the plant <br />completed. 1986 <br /> <br />Current Year - (Answer to A.) = Age in years <br />1992 1986 = 6 Years <br /> <br />Enter Age in Part C., below. <br /> <br />B. Check the type of treatment facility that is employed: <br />Factor <br /> <br />x <br /> <br />Mechanical Treatment Plant <br />(Trickling filter, activated <br />sludge, etc.) <br /> <br />2.5 <br /> <br />Aerated Lagoon <br /> <br />Stabilization Pond <br /> <br />2.0 <br />1.5 <br /> <br />Other (Specify) <br /> <br />1.0 <br /> <br />c. Multiply the factor listed next to the type of facility your community <br />employs by the age of your facility to determine the total point value <br />of Part 3: <br /> <br />TOTAL POINT VALUE FOR PART 3 = 2.5 x <br />(factor) <br /> <br />6 <br />(age) <br /> <br />= <br /> <br />15 <br /> <br />Enter this value or 50, which ever is less, on the point calculation <br />table on the last page. <br /> <br />8 <br />