Laserfiche WebLink
<br />PAR T 5: <br /> <br />ULTHIATE DISPOSITION OF SlUOGE <br /> <br />A. What is the final disposition of sludge from your treatment plant? <br /> <br />Land Application, sludge spray field with drying beds for backup & <br /> <br />Commercial landfill <br /> <br />B. Oescribe sludge management practices <br /> <br />'Aerobic Digestion <br /> <br />Holding tanks, thickening with floating aeration <br /> <br />Land application by irrigation style spray equipment <br /> <br />C. If sludge is disposed of by land application (surface application or <br />shallow injection), complete the following: <br /> <br />(1) Ooes your facility have access to sufficient land for: (Circle <br />the appropriate point total.) <br /> <br /> (3 or more yea rs = 0 pOin~ <br /> 24-3~ monws - Iv pOl n s <br /> 12-23 months = 20 points <br /> 6-12 months = 30 points <br /> less than 6 months = 50 points <br />(2) What type of cover is on the site? <br /> <br />X Crops consumed by animals whose products are consumed <br />by humans. <br />Crops that are directly consumed by humans. <br /> <br />Neither directly or indirectly consumed by humans. <br /> <br />No plant cover. <br /> <br />10 <br />