My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-010-RES WHEREAS, the City Council of recognizes the importance of the Lamar of Education, Business and
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1992
>
1992-010-RES WHEREAS, the City Council of recognizes the importance of the Lamar of Education, Business and
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:33:11 PM
Creation date
4/11/2005 1:34:22 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1992
Doc Type
Resolution
CITY CLERK - Date
2/10/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />legal notice in a single publication: A Finding of No Significant Impact, and a Notice <br />of Intent to Request Release of funds. In the first part of this notice, Contractor <br />certifies that, as a result of the Environmental Assessment, the project is not an action <br />which mayor will significantly affect the quality of the human environment. <br />Contractor shall then provide the public with at least fifteen (15) calendar days to <br />comment on this combined notice following its publication date, unless exceptional <br />circumstances exist as specified in 24 C.F.R. Section 58.46. If no unresolved <br />problems occur, Contractor must then concurrently submit to ATCOG the following <br />documents: <br /> <br />1. Publisher's Affidavit and Certification form, for the combined legal notice <br />(to be provided as described above); and <br /> <br />2. Request for Release of Funds form (to be provided as described above). <br /> <br />Upon receipt of such documents, A TCOG must allow a fifteen (15) calendar days <br />comments period to expire before it can formally release any project funds which are <br />subject to the environmental review regulations. Contractor must comply with all <br />other applicable environmental requirements as specified in Exhibit 0 of this contract. <br />Contractor shall document its compliance with such other requirements in its <br />environmental review file. <br /> <br />SECTION 21. CITIZEN PARTICIPATION REQUIRMENTS <br /> <br />A. Contractor shall hold a public hearing concerning any substantial change, as <br />determined by the ATCOG, proposed to be made in the use of funds provided under <br />this contract; <br /> <br />B. Prior to the termination of this contract, Contractor shall hold a public hearing <br />to review its performance under this contract; <br /> <br />C. For each public hearing scheduled and conducted by Contractor under this <br />section, Contractor shall comply with the following requirements: <br /> <br />1. Notice of each hearing shall be published in the non-legal section of a <br />newspaper having general circulation in Contractor's jurisdiction at least <br />seventy-two (72) hours prior to each scheduled hearing. The published notice <br />shall include the date, time, and location of each hearing and the topics to be <br />considered at each hearing. The published notice shall be printed in both <br />English and Spanish, if appropriate. ATCOG shall accept articles published in <br />such newspapers which satisfy the content and timing requirements of this <br />subsection. In addition, Contractor shall prominently post such notices in public <br />buildings. <br /> <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.