Laserfiche WebLink
<br />EXHIBIT A <br /> <br />PERFORMANCE STATEMENT <br /> <br />CITY OF PARIS/LAMAR COUNTY <br /> <br />Proiect Descriotion <br /> <br />The purpose of this Economic Development project is construction of a 12' diameter <br />watermain extending south along 1 st Street SW from West Kaufman Street to the <br />intersection of West Hearne and 1 st SW. <br /> <br />Financial Information <br /> <br />Constractor shall utilize One Hundred Fiftv Thousand and No/100 Dollars 1 $150.0001 <br />of contract funds and Fiftv Five Thousand Seven Hundred and No/100 Dollars <br />1$55.7001 of Contractor's funds for construction costs. <br /> <br />Three Million Nine Hundred Sixtv Eight Thousand Four Hundred Eightv Four and <br />No/100 Dollars 1$3,968.4841 of Contractor's funds shall be utilized for jail <br />construction. <br /> <br />Eiahtv Seven Thousand Three Hundred Dollars and No/100 1 $87.3001 of Contractor's <br />funds shall be utilized for sanitary sewer rehabilitation. <br /> <br />Contractor shall provide to ATCOG, upon request, evidence that project funds, were <br />expended as specified in this Exhibit A and in Exhibit B of this contract. <br /> <br />Engineerina <br /> <br />Thirtv One Thousand Five Hundred and No/100 Dollars 1$31,500) of Contractor's <br />funds shall be utilized for engineering costs. <br /> <br />Administrative <br /> <br />Three Thousand and No/1 00 Dollars 1 $3,0001 shall be utilized for administrative costs. <br /> <br />Proiect Outcomes <br /> <br />As a reult of this project Constractor shall ensure that Forty three (43) existing jobs <br />will be retained. In the event more permanent jobs are created, Contractor shall <br />ensure that at least Fifty one persent (51 %) of all jobs created are provided to low and <br />moderate income persons. A low to moderate income person is defined in the TCDP <br />Project Implementation Manuel referenced in Section 16. <br /> <br />Page 1 <br />