Laserfiche WebLink
<br />3.10. If OWNER designates a person to represent OWNER at the <br />site who is not ENGINEER or ENGINEER'S agent or employee, the <br />duties, responsibilities and limitations of authority of sucn other <br />person and the af:ec~ thereof on the duties and responsibilities of <br />ENGINEER will be set for~h in an exhibi~ that is to be identified, <br />attached to and made a part of this Agreement before such services <br />begin. <br /> <br />3.11 If more than one prime contract is to be awarded for <br />construction, materials, equipment and services for the entire <br />Project, designate a person or organization to have authority and <br />responsibility for coordinating the activities among the various <br />prime contractors. <br /> <br />3.12. Furnish to ENGINEER data or estimated figures as to <br />OWNER'S anticipated costs for services to be provided by others for <br />OWNER so that ENGINEER may make the necessary findings'to support <br />opinions of prObable Total Project Costs. <br /> <br />3.13. Attend the pre-bid conference, bid <br />preconstruct ion conferences, construction progress and <br />related meetings and substantial completion inspections <br />payment inspections. <br /> <br />opening, <br />other job <br />and final <br /> <br />3.14. Gi ve prompt written notice to ENGINEER whenever OWNER <br />observes or otherwise becomes aware of any development that affects <br />the scope or timing of ENGINEER'S services, or any defect or non- <br />conformance in the work of any CONTRACTOR. <br /> <br />3.15. <br />Services <br />services <br /> <br />Furnish, or <br />as stipulated <br />as required. <br /> <br />direct ENGINEER to provide, Additional <br />in paragraph 2.1 of this Agreement or other <br /> <br />3.16. Bear all costs incident to compliance with the <br />requirements of this Section 3. <br /> <br />SECTION 4 - PERIOD OF SERVICE <br /> <br />4.1. The provisions of this Section 4 and the various rates of <br />compensation for ENGINEER'S services provided for elsewhere in this <br />Agreement have been agreed to in anticipation of the orderly and <br />continuous progress of the Project through completion of the <br />Construction Phase. ENGINEER'S obligation to render services <br />hereunder will extend for a period which may reasonably be required <br />for the des ign, award of contracts, and construction of the <br />project, including extra work and required extensions thereto. <br /> <br />4.2. ENGINEER'S services under the Preliminary Design, Field <br />surveys and the Final Design Phase shall each be considered <br />complete at the earlier of (1) the date when the submissions for <br />that phase have been accepted by OWNER or (2) thirty days after the <br />date when such submissions are delivered to OWNER for final <br />acceptance, plus such additional time as may be considered <br />reasonable for obtaining approval of governmental authorities <br />having jurisdiction over design criteria applicable to the Project. <br /> <br />Page 10 of 23 Pages <br />