Laserfiche WebLink
<br />@ Southwestern Bell <br />Telephone <br /> <br />SW-i4320 <br />(Rev. 4-87) <br /> <br />c) Field inspections results developed by 8 multiple applicants in accordance with A"icle VII A) <br />2) (b), must be submitted to the Telco within 30 days of the most recent date upon which the <br />applicant's pending application(s) have been classified as non-simultaneous. Failure of an <br />applicant to comply with this requirement will be conSidered by the Telco as a cancellation of <br />the application(s) involved. <br /> <br />2) Pre-License Survey Costs <br /> <br />Each multiple applicant will be charged the applicable pre-license survey costs incurred by the <br />Telco relative to a determination of the make-ready work required to accommodate attachment <br />or utilization of the individual applicant's communications facilities on a non-simultaneous baSIS. <br /> <br />3) Make-Ready Completion Schedule <br /> <br />The date of receipt (earliest taking precedence) by the Telco of applications filed in accordance <br />with A"icle VI B) will determine the priority of make-ready work completion by the Telco. Any <br />change in priority of pole, anchor, anchor/guy strand or conduit availability will require an <br />appropriate change in make-ready work completion of the application(s) involved and be subject <br />to the Telco's ability to accommodate the specific change(s) required in its established work <br />schedule. <br /> <br />4) Make-Ready Work Costs <br /> <br />Make-ready work costs will be allocated as follows: <br /> <br />a) The initial applicant will be charged the total cost incurred bv 'he Telco to accommodate the <br />attachment, utilization or occupancy of the initial applicant's ~:.."munications facilities on poles, <br />anchors or in conduits on a non-simultaneous basis. <br /> <br />b) The additional applicant(s) will be charged the total cost incurred by the Telco to accommodate <br />the anachment. utilization or occupancy of the additional applicant's communications facilities <br />on poles. anchors or in conduits for which prior attachment. utilization or occupancy <br />authorization has been granted to another applicant. <br /> <br />I El PRE-LICENSE SURVEY COMPLETION - TELCO <br /> <br />In performing all field inspections and associated administrative processing for which it may be <br />responsible. the Telco will endeavor to include such work in its normal work load schedule. <br /> <br />I Fl CHANGES IN APPENDIX <br /> <br />This Appendix may be changed in whole or in pa" at any time during the term of this Agreement at <br />the sole option of the Telco upon the giving of not less than 60 days written notice thereof to the <br />Applicant and to substitute in place thereof such other provisions as the Telco may deem necessary <br />as relative to multiple attachments to poles and anchors or utilization of anchor/guy strands of the <br />Telco. <br /> <br />The City of Paris, Parts, Texas <br /> <br />Southwe.t.rn Sell Telephone Co. <br /> <br />By: <br /> <br />Michael E. Malone <br />City Hanager <br /> <br />By: <br /> <br />Its: <br /> <br />Its: <br /> <br />Date: <br /> <br />August 10, 1992 <br /> <br />Date: <br /> <br />Page 3 of 3 <br />