My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-030-RES WHEREAS, the City Council of the City of Paris, did in Resolution No.9l-014 on January 21,1991, approve
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1991
>
1991-030-RES WHEREAS, the City Council of the City of Paris, did in Resolution No.9l-014 on January 21,1991, approve
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:33:16 PM
Creation date
4/13/2005 4:07:06 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1991
Doc Type
Resolution
CITY CLERK - Date
3/11/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT <br /> <br />THIS AGREEMENT is dated as of the 11th day of March in <br />the year 19n by and between City of Paris, Paris, Texas, <br />(hereinafter called OWNER) and Bill Hazelwood. Incorporated <br />(hereinafter called CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br /> <br />Article 1. WORK. <br /> <br />CONTRACTOR shall complete all Work as specified or indicated in the <br />Contract Documents. The Work is generally described as follows: <br /> <br />Pro rata 12" water main extension Highway 271 North <br /> <br />The Project for which the Work under the Contract Documents may be <br />the whole or only a part is generally described as follows: <br /> <br />Construction of approximately 3160 L.F., 12" AWWA C-900 <br />water main, fire hydrant assemblies, valves, water <br />services and other appurtenant construction, complete in <br />place. <br /> <br />Article 2. ENGINEER. <br /> <br />The Project has been designed by City Engineer, City of Paris, <br />Paris, Texas, or his authorized representative, who is hereinafter <br />call ENGINEER and who is to act as OWNER'S representative, assume <br />all duties and responsibilities and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with <br />completion of the Work in accordance with the Contract Documents. <br /> <br />Article 3. CONTRACT TIME. <br /> <br />3.1 The Work will be substantially completed within 60 days <br />from the date when the Contract Time commences to run as provided <br />in paragraph 2.3 of the General Conditions, and completed and ready <br />for final payment in accordance with paragraph 14.13 of General <br />Conditions within 90 days from the date when the Contract Time <br />commences to run. <br /> <br />3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time <br />is of the essence of this Agreement and that OWNER will suffer <br />financial loss if the Work is not completed within the times <br />specified in paragraph 3.1 above, plus any extensions thereof <br />allowed in accordance with Article 12 of the General Conditions. <br />They also recognize the delays, expense and difficulties involved <br /> <br />19 <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.