Laserfiche WebLink
Item No. 9 <br />memo�randuin <br />TO: Mayor & City Council <br />Gene Anderson, Interim City Manager <br />FROM: Carla Easton, P.E., Community Development Director <br />SUBJECT: PUMP TRACK CONSTRUCTION CONTRACT <br />DATE: March 4, 2020 <br />BACKGROUND: In 2018 the city applied for a Texas Parks & Wildlife Department (TPWD) <br />outdoor recreation grant that would provide a 50% cost match for a pump track project as provided <br />in the city's park plan. The city partnered with the VCC, Rotary Club, and a number of local <br />businesses and individuals who have contributed both monetary and in-kind contributions for <br />construction of the pump track. The TPWD contract was signed in December 2019 and we are <br />now prepared to proceed with a contract for construction. <br />STATUS OF ISSUE: The overall project includes approximately 16,000 SF of asphalt track <br />designed to include competition level hills and turns, as well as site grading, shade structures, a <br />dedication wall and pedestrian amenities such as picnic tables and sidewalks to the parking lot. <br />The design and construction of the asphalt track as a custom park is a specialized service provided <br />by only a few companies. Hayter Engineering, with help from the Chamber of Commerce, VCC <br />and a number of local bicycle enthusiasts worked closely with Velosolutions to develop a scope <br />and budget for the pump track project. Velosolutions (a subsidiary to American Ramp Company) <br />is the leading builder of competition tracks across the world, and they are a participating vendor <br />in the purchasing cooperative Sourcewell, of which the city is a member. Sourcewell provides <br />procurement oversight for a number of products and services used by governments, educational <br />institutions, and non -profits, by soliciting competitive bids and offering the lowest price for public <br />projects. The city has used this method of procurement for playground equipment, generators, <br />fleet vehicles, and other significant purchases. <br />Through the Sourcwell coop, we have received a contract from American Ramp <br />CompanyNelosolutions for the Paris Pump Track Construction Project in the amount of <br />$451,691.86, which includes final track design and installation of the asphalt track and shade <br />structures. <br />