Laserfiche WebLink
<br />CHANGE ORDER <br /> <br />(Instructions on reverse side) <br /> <br />No. <br /> <br />Two <br /> <br />PROJECf: <br /> <br />DATE OF ISSUANCE: <br /> <br />10TH S.E. SEWER LINE REPLACEMENT <br /> <br />March 5, 1991 <br /> <br />OWNER: <br /> <br />(Name, CITY OF PARIS <br />Address) P.O. BOX 9037 <br />PARIS TEXAS 75461-9037 <br />CONTRACfOR: ' <br /> <br />BILL HAZELWOOD, INC. <br /> <br />OWNER's Project No. <br /> <br />88-WSRB-09-90 <br /> <br />ENGINEER: <br /> <br />HAYTER ENGINEERING, INC. <br /> <br />CONTRACf FOR: <br />Installation of approximately 5214 linear <br />feet of 4" ,6",10", and 12" SDR 26 and SDR ENGINEER'sProjectNo. <br />~r:; pur Cl:Pt.1Pl'" nino. n"lnnn......l ","co -::inA .....+-,....,,...,.... ..,rr.'....+-.................,.,......... <br /> <br />You are directed to make the following changes in the Contract Documents. <br /> <br />Description: <br /> <br />See Attached Page <br /> <br />Purpose of Change Order: <br /> <br />The existing 2" water <br /> <br />re{>laced with the 6" line. This should <br />thlS cont~ct) is initiated. <br />AtlaCtunents: (LIst documents suppomng change) <br /> <br />line is a maintenance problem and should be <br />be done before the HMAC overlay (part of <br /> <br />CHANGE IN CONTRACf PRICE: <br /> <br />CHANGE IN CONTRACf TIME: <br /> <br />Original Contract Price <br /> <br />Original Contract Tune <br /> <br />$ <br /> <br />$449,779.90 <br /> <br />150 <br /> <br />claysorda.t.e <br /> <br />Previons Change Orders No. 1 <br /> <br />to No. <br /> <br />Net change from previous Change Orders <br /> <br />$ <br /> <br />S412.068.00 <br /> <br />o <br /> <br />"'" <br /> <br />Contract Price prior to this Change Order <br /> <br />Contract Time Prior to this Change Order <br /> <br />$ <br /> <br />$412,068.00 <br /> <br />150 <br />claY5<<c!a1c <br /> <br />Net Increase (~ of this Change Order <br /> <br />Net Increase (decrease) of this Change Order <br /> <br />$ <br /> <br />$10,224.00 <br /> <br />o <br />"Y' <br /> <br />Contract Price with all approved Change Orders <br /> <br />Contract Time with all approved Change Orders <br /> <br />$ <br /> <br />$[,,?? ?Q? nn <br /> <br />Pin <br />cla)'Sordate <br /> <br />RECOMMENDED: <br /> <br />APPROVED: <br />CITY OF PARIS. PARIS, TX <br /> <br />APPROVED: <br /> <br />by <br /> <br />~ncer <br /> <br />by by <br />Eric S. ctilford, Mayor <br />OWNER <br /> <br />Cont~toc' <br /> <br />ATTEST: <br /> <br />Mattie Cunningham, City Clerk <br /> <br />EXHIBIT A <br />