Laserfiche WebLink
<br />STATEMENT OF THE COST TO REPAIR <br /> <br />BU82H (Lamar Ave.) & 24th N.E. <br />2" PVC Conduit Replaced, N.E. Corner <br />Materials $ 5.26 <br />Labor (3 hours) $ 105.69 <br />Equipment (3 hours) $ 51.00 <br />Subtotal $ 161.95 <br /> <br />BU82H (Lamar Ave.) & 31st N.E. <br />Pedestrian Pole Base Replaced, S.E. Corner <br />Materials $ 90.61 <br />Labor (2 hours) $ 42.64 <br />Equipment (2 hours) $ 34.00 <br />Subtotal $ 167.25 <br /> <br />I" PVC Condu it Rep 1 aced. <br />Materials <br />Labor (2 hours) <br />Equipment (2 hours) <br />Subtotal <br /> <br />Loop Lead-in Spliced <br />$ 14.52 <br />$ 42.64 <br />$ 34.00 <br />$ 91.16 <br /> <br />South Bound Front 3 Loops <br />Three 6' x 6' Loop Detectors Replaced <br />Materi a 1 s $ 150.00 <br />Labor (1 hour) $ 521.32 <br />Equipment (1 hour) $ 17.00 <br />Subtotal $ 688.32 <br /> <br />North Bound All Loops <br />Four 6' x 6' Loop Detectors Replaced <br />Materials $ 187.50 <br />Labor (1 hour) $ 646.32 <br />Equipment (1 hour) $ 17.00 <br />Subtotal $ 850.82 <br /> <br />Ground Box Replaced S.E. <br />Materials <br />Labor (1 hour) <br />Equipment (1 hour) <br />Subtota 1 <br /> <br />Corner <br />$ 82.82 <br />$ 21.32 <br />$ 17.00 <br />$ 121.14 <br /> <br />--------- <br />--------- <br /> <br />GRAND TOTAL <br /> <br />$2,080.64 <br /> <br />.' EXHIBIT" <br />