Laserfiche WebLink
Item No. 9 <br />Code Enforcement Report; March 2020 <br />Cases Worked: 162 <br />Cases Completed: 128 <br />Initial Inspections: 162 <br />Re -inspections: 221 <br />Lots Abated: 27 <br />Other Work by Abatement Crew: <br />Mowed 6 Right -of -Ways —1 days <br />Tree Removal — 2 days <br />Removed Tires — 9 day <br />Removed Illegal Dumps — 7 days <br />Repaired/Serviced Equipment — 2 days <br />Worked at Wise Field Shop — 2 day <br />Building,_and Stwawndardsw gport: March,,w2020 <br />There were 9 structures presented to the commission: <br />2004 Cleveland 926 W Cherry <br />322 NE 17th 743 NW 4th <br />717 NW 4th 1758 NE 10th <br />142 Plum 387 NW 3rd <br />359 NW 12th <br />4 Structures were demolished: <br />716 E Washington <br />115 NW 131h <br />1214 W Kaufman <br />714 NW 4th <br />