Laserfiche WebLink
<br />5. Revise strip door height to 14' 10" with <br />'header modifications per the attached <br />drawing. <br /> <br />6. <br /> <br />Increase linear footages of wall and <br />floor cracks, to be sealed as described <br />under "Remedial Repairs to Existing <br />Concrete Basins," page 134 of the <br />technical specifications and Addenda <br />*2. Increase 450 LF originally <br />specified to 530 LF @ $38.00/LF. <br /> <br />7. Contract time is extended by 8 days to <br />allow for abnormal amounts of inclement <br />weather May 15, 1991 through June 25, <br />1991. Contract time is extended 5 days <br />to allow for time lost due to unavail- <br />ability of reinforcing steel between <br />May 15, 1991 and May 20, 1991. <br /> <br />Increase contract time by 13 days <br /> <br />TOTAL : <br /> <br />NET CHANGE IN CONTRACT PRICE: <br /> <br />TIME INCREASED BY 15 DAYS <br /> <br />$ <br /> <br />946.85 <br /> <br />$ 3,040.00 <br /> <br />$13,918.71 <br />$12,910.44 <br /> <br />$ 1,008.27 <br />