Laserfiche WebLink
In addition to the bond fund projects, the Street Department in Public Works attempts to evaluate <br />all of the streets in Paris at least twice a year to develop a schedule for maintenance operations, <br />which typically includes repairs to the roadway base material, then a chip seal surface treatment. <br />Chip seal treatments provide a seal coat to protect the base from water infiltration, preserving its <br />life for about three additional years. Three to six streets are selected in each quadrant of the city, <br />and chip seal operations are completed with in-house crews over the course of the year as weather <br />permits. While it has a limited life expectancy vs. a mill and overlay, chip and seal is a very cost <br />effective approach of sealing large amounts of road each year in preparation for when budget <br />allows for a mill and overlay to take place. For pavement cuts required for utility work, the Street <br />Department uses both hot mix and cold mix for asphalt patches, and works closely with the water <br />and sewer supervisor for repair work. The maintenance budget does not provide for full width hot <br />mix asphalt paving for an entire street, only patching to repair street cuts or address maintenance <br />issues. Hot mix is also not an option for attempting to patch holes throughout town as it will cool <br />too quickly in between stops — it is best used in a localized area. Hot mix, while it binds stronger <br />than cold mix, is more expensive and therefore only so many patches can be repaired using it vs. <br />cold mix. City crews spend approximately $600,000 on materials for street repairs each year. The <br />2020 project list for chip seal resurfacing includes the following streets: <br />t" IJAD <br />STREET <br />SW <br />Austin from 7th NW to <br />w�� .... <br />_Dead _End <br />5th SW from Austin to Sherman��....... <br />—� <br />13th SW from Washington to_Sherman <br />16 -18th SW from Bonham to Kaufman <br />.NW <br />19th NW from Loop 2_86 to Dead End <br />9th NW from Graham to Cherry <br />10th NW from Graham to Cherry <br />....,W .......�� <br />4th NW from Henderson to Campbell <br />.—.��w...� ............... <br />Henderson from 7th NW to 19th NW <br />...... __.... <br />.ww�.�.w................ �..................-..... <br />Lake Crook (inside park) <br />NE <br />46th NE from Lamar to Pine Mill <br />Booth from Fitzhugh to 12th NE <br />............ .... <br />Clement from N Main to 17th NE <br />1O <br />10th NE from Tudor to Hearne <br />Givens Road from FM 195 to City Limit <br />�Askins <br />Road from FM 195 to City Limit <br />SE <br />Old Jefferson from of mm.......... <br />New Jefferson to 6th SE <br />12th SE from �Jackson to Old Jefferson <br />