Laserfiche WebLink
recommended that a new facility be built, more on this will be provided in a near future City <br />Council meeting. We are currently experiencing an incredible low in interest rates throughout the <br />market, we have also sent in a pre -application to pursue a revolving loan fund through the State <br />which would further have great interest savings over a 30 year life. Nevertheless, we are currently <br />looking at a very large expense to build the facility which will need to be supported by the <br />Wastewater Rate. If the City were to approve proceeding with this project in 2020; design through <br />completion would take 3-5 years. It is at that time we would experience the full impact of a debt <br />service payment. It is strongly recommended that the City begin a healthy and gradual ascent in <br />its Wastewater Rate to prepare itself for this ultimate expense, but more importantly to acclimate <br />our users gradually over the span of 3-5 years rather than a sudden and drastic increase at the end. <br />Ultimately, debt payments will be owed when they come due, therefore being prepared with the <br />Wastewater Rate to afford these payments will prevent a drastic impact to the reserves or, much <br />worse, to taxes. City Staff will do all it can to look for opportunities to find savings in the design <br />and construction of the project, there will be some minor savings in efficiency through operation <br />and maintenance brought on by a new facility, the drastic reduction in infiltration that is occurring <br />between the City and the Facility currently will bring about some savings, and Staff will look for <br />an opportunity to refinance existing debt during this time if rates continue to hold low. Ultimately <br />though, it is the Staff and Engineer's recommendation that we strategically begin to address this <br />much needed project now, including adjusting our rates, to avoid the ultimate situation of being <br />forced to act by the TCEQ — or worse, suffer a failure of operation at the Wastewater Treatment <br />Facility. Adjusting rates pursuant to Scenario 1 would be a step in managing the ultimate impact <br />to users over the next 3-5 years. <br />BUDGET: The rate study cost is $28,500 similar to previous years. Funds are budgeted in the <br />Water Billing Office budget to pay for the study. <br />OPTIONS: <br />1. Adopt Scenario 1 rates which cover the full cost of service of the water and wastewater <br />system (note — this does not take in to account the Wastewater Treatment Facility, that will <br />need to be examined if and when the Council approves the design to proceed). <br />2. Adopt Scenario 2 which meets the minimum amount of our rate maintenance policy but <br />does not cover the full cost of service of the system and relies on reserves to make up the <br />shortfall (note — again, this does not take in to account the WWTF). <br />3. Adopt a third scenario to be specified by the Council — City Staff will be available to discuss <br />scenarios the council might have. <br />RECOMMENDATION: The staff recommends the Council, given the long term forecast with the <br />Wastewater Treatment Facility, adopt Scenario 1 rates. <br />