My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-028 - Revising Article III Chapter 24 - Wastewater Discharge & Disposal in Conformance with current EPA
City-of-Paris
>
City Clerk
>
Ordinances
>
2011-2020
>
2020
>
2020-028 - Revising Article III Chapter 24 - Wastewater Discharge & Disposal in Conformance with current EPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 12:02:44 PM
Creation date
7/30/2020 11:46:48 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
........... <br />See. 34-77. - Wastewater contribution permit system. <br />(a) Requirement for a permit. Any user shall have a wastewater contribution permit prior to <br />discharging into the city sewer system if - <br />(1) The discharge is subject to promulgated national categorical pretreatment standards; <br />(2) The discharge contains pollutants in concentrations or quantities that interfere or have the <br />potential to interfere with the operation of the sewer system. or increase the costs of <br />operation of the systems, as detennined by the city; <br />(3) The discharge requires pretreatment in order to comply with the discharge limitations in <br />this article; <br />()"Che discharge is twenty-five thousand (25,000) gallons or more of processed wastewater <br />per day. <br />(5) Within one (1) year of being designated a Significant Industrial User, the city shall <br />determine if the user needs a spill prevention plan orother action to control slug <br />discharges. Records of such plans or slug control activities shall be kept for a period of <br />three (3) years by both the user and city and made available to appropriate EPA and TCEQ <br />personnel upon request. <br />(b) Permit informadom New significant industrial users shall file an application in the form <br />prescribed by the city at least ninety (90) days. prior to connecting to the POTW. Any other <br />non-domestic user shall file an application when notified within ninety (90) days of receipt of <br />notice to do so. In support of the application, the user shall. submit in units and terms <br />appropriate for evaluation, the following information as required by the supervisor: <br />N"'Moff—MM, <br />
The URL can be used to link to this page
Your browser does not support the video tag.