Laserfiche WebLink
<br />5. <br /> <br />Seal walls of existing MH's wjshot- <br />crete liner. Add 25.25 <br />VF @ $100.00jVF <br /> <br />6. Seal isolated defects in existing MH <br />walls, complete. Add 4 EA @ $430.00jEA <br /> <br />7B. st'd 6' replacement MH wjwatertight <br />ring & cover, installed & complete. <br />Add 2 EA @ $3,300.00jEA <br /> <br />7C. Additional replacement MR depth, <br />installed & complete. Deduct 10 EA <br />@ $95.00jEA <br /> <br />7D. Drop structure for replacement MH, <br />installed & complete. Deduct 2 EA <br />@ $370.00jEA <br /> <br />8. <br /> <br />Rebuild existing MR invert & <br />benches, complete. Deduct 2 EA <br />@ $650.00jEA <br /> <br />10. Trench safety protection. Deduct <br />1,032 LF @ $2.00jLF <br /> <br />11. Point repair outside MR, 4', <br />in pavement. Add 13 EA @ <br />$l,OOO.OOjEA <br /> <br />12. Point repair outside MR, 4', <br />outside pavement. Add 14 EA <br />@ $750.00jEA <br /> <br />Net <br /> <br />Project Recap: <br />orig. Contract Price <br />Change Order No. 1 <br />Change Order NO. 2 <br /> <br />- $529,211.00 <br />(7,990.00) <br />15.367.00 <br />$536,588.00 <br /> <br />2,525.00 <br /> <br />1,720.00 <br /> <br />6,600.00 <br /> <br />13,000.00 <br /> <br />10,500.00 <br /> <br />950.00 <br /> <br />740.00 <br /> <br />1,300.00 <br /> <br />2,064.00 <br /> <br />$47,070.00 $31,703.00 <br />$15,367.00 <br />