Laserfiche WebLink
STERLING <br />1 IIN I r10 I <br />This Statement of Work (SOW) describes the managed deployment services to be provided by <br />Sterling, ("Provider") for Paris, Texas, ("Customer"). The term of this SOW shall begin on the <br />date of the last signature ("Effective Date") as setforth in the Signature Section of this SOW. This <br />SOW shall expire if not executed within ninety (90) days of the date of creation. <br />E.iC VIIIIlllllll i..l.. II I..I..AIIIL.S <br />These Services will be limited to 200 contiguous business <br />Period of Performance <br />Hours conducted over a period of time not to exceed 9 <br />business Weeks. <br />8:00 AM and 5:00 PM local Sterling Customer time, Monday <br />through Friday, excluding normally observed holidays based <br />Service Normal <br />on a forty (40) hour week. <br />Hours Business <br />4(")""'I""'llllllllllllm During Project Kickoff, Sterling and Customerwill <br />Hours <br />discuss cutover schedules that may take place after hours to <br />limit production impact at no additional charge for afterhours <br />work. <br />Paris, Texas <br />Place of Performance <br />Remote Services <br />Paris TX 75460 <br />. c lulll6,llll111!ll. IIIIIIIIII' Illllllllll.11lllw�lll l <br />Sterling will provide supplemental expertise to serve as an extension of the Customer's internal <br />staff, as specifically described herein. <br />Remote Hyper -V and Storage M igration Services <br />2.1 lntrc I:iii i° <br />The following proposal was created after the discussions with the customer on the request to <br />provide new hardware and services to refresh their current Production and DR data center <br />environments. <br />The proposal includes the remote deployment and configuration of the following equipment: <br />• Six (6) Dell PowerEdge R640 Servers <br />• Two (2) Dell ME4024 DAS Storage Arrays <br />• Two (2) Dell DD3300 with Avamar Software <br />After deployment of the new equipment, Sterling will assist with the migration of the existing <br />Hyper -V infrastructure to include the new clusters. Next, Sterling will setup and configure the <br />Hyper -V replication between the Production and DR sites. <br />877.242.4074 <br />Project Kick Off <br />Conference call with Customer to obtain site-specific information, set expectations, etc. <br />Customer will provide configuration information for any existing infrastructure as needed <br />to prepare for services, prior to engineer onsite arrival <br />Review scope of work, discuss project objectives and expectations <br />Customer to inventory all equipment and confirm receipt at least one week prior to <br />engineer remote start of services <br />,,,, info@sterlingcomputers.com <br />) www.Aerlingcomputers.com <br />