My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-147-RES WHEREAS,CITY COUNCIL IS DESIROUS OF MAINTAINING AN ADEQUATE WASTEWATER
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1989
>
1989-147-RES WHEREAS,CITY COUNCIL IS DESIROUS OF MAINTAINING AN ADEQUATE WASTEWATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:34:04 PM
Creation date
4/15/2005 1:02:48 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1989
Doc Type
Resolution
CITY CLERK - Date
12/11/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />that ENGINEER may make the necessary findings to support opinions of <br />probable Total Project Costs. ' <br /> <br />3.13. Attend the pre-bid conference, bid opening, preconstruction <br />conferences, construction progress and other job related meetings and <br />substantial completion inspections and final payment inspections. <br /> <br />3.14. Give prompt written notice to ENGINEER <br />observes or otherwise becomes aware of any development <br />scope or timing of ENGINEER'S- services, or any <br />conformance in the work of any CONTRACTOR. <br /> <br />whenever OWNER <br />that affects the <br />defect or non- <br /> <br />3.15. Furnish, or direct ENGINEER to provide, Additional Services as <br />stipulated in paragraph 2.1 of this Agreement or other services as <br />required. <br /> <br />3.16. Bear all costs incident to compliance with the requirements of this <br />Section 3. <br /> <br />SECTION 4 - PERIOD OF.. SERVICE <br /> <br />" <br />4.1. The provisions of this Section 4 and the various rates of <br />compensation for ENGINEER'S services provided for. elsewhere in this <br />Agreement have been agreed to in anticipation of the orderly and <br />continuous progress of ,the Proj ect through completion of the <br />Construction Phase. ENGINEER'S obligation to render services hereunder <br />will extend for a period which may reasonably be required for the design, <br />award of contracts, and"construction of the project, including extra work <br />and required extensions thereto. <br /> <br />4.2. ENGINEER'S services under the Preliminary Design and Field <br />Surveys Phase and tlie Final Design Phase shall each be considered <br />complete at the earlier of (1) the date when the submissions for that <br />phase have been accepted by OWNER or (2) thirty days after the date <br />when such submissions are delivered to OWNER for final acceptance, plus <br />such additional time as may be considered reasonable for obtaining <br />approval of governmental authorities having jurisdiction over design <br />criteria applicable to the Project. <br /> <br />4.3. After acceptance by OWNER of the ENGINEER'S Drawings, <br />Specifications and other Final Design Phase documentation including the <br />most recent opinion of probable Project Cost, ENGINEER shall proceed <br />with performance of the services called for in the Bidding Phase. This <br />Phase shall terminate and the services to be rendered thereunder shall be <br />considered complete upon commencement of the Construction Phase or <br />upon cessation of the negotiations with prospective CONTRACTOR(S). <br /> <br />4.4 The Construction Phase will commence with the execution of the <br />prime construction contract to be executed for the work of the Project, <br />and will terminate upon written recommendation by ENGINEER of final <br />payment on the prime construction contract. <br /> <br />Page 10 of 17 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.