My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-147-RES WHEREAS,CITY COUNCIL IS DESIROUS OF MAINTAINING AN ADEQUATE WASTEWATER
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1989
>
1989-147-RES WHEREAS,CITY COUNCIL IS DESIROUS OF MAINTAINING AN ADEQUATE WASTEWATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:34:04 PM
Creation date
4/15/2005 1:02:48 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1989
Doc Type
Resolution
CITY CLERK - Date
12/11/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.4.5. Furnish two copies of the above documents. and of the Drawings <br />and Specifications and present and review them in person with OWNER. <br />Three additional copies will be furnished by the ENGINEER to the <br />appropriate review agencies. <br /> <br />1.5. Bidding Phase <br /> <br />After authorization to proceed with the Bidding Phase, ENGINEER shall: <br /> <br />1.5.1. Assist OWNER in advertising for and obtaining bids for each <br />separate prime contract for construction, materials, equipment and <br />services; and maintain a record of prospective bidders to whom Bidding <br />Documents have been issued, attend pre-bid conferences and receive and <br />process deposits for Bidding Documents. <br /> <br />1.5.2. Issue addenda as appropriate to interpret, clarify or expand the <br />Bidding Documents. , <br /> <br />1.5.3. Consult with and advise OWNER as to the acceptability of <br />subcontractors, supplier~and other persons and organizations proposed by <br />the prime contractor(s)', (herein called "CONTRACTOR(S)" for those <br />portions of the work as to which such acceptability is required by the <br />Bidding Documents. .. <br /> <br />1.5.4. Consult with OWNER and determine the acceptability of substitute <br />materials and equipment proposed by CONTRACTOR(S) when substitution <br />prior to the award of contracts is allowed by the Bidding Documents. <br /> <br />1.5.5. Attend the bid opening, prepare bid tabulation sheets and assist <br />OWNER in evaluating bids and in assembling and-awarding contracts' for <br />construction, materia~~, equipment and services. . <br /> <br />1.6. Construction Phase <br /> <br />During the construction phase: <br /> <br />1.6.1. General Administration of Construction Contract. ENGINEER shall <br />consult with and advise OWNER and act as OWNER'S representative as <br />provided in the construction contract. The extent and limitations of the <br />duties, responsibilities and authority of ENGINEER as assigned in said <br />contract shall not be modified, except to the extent provided in Exhibit A <br />"Further Description of Basic Engineering Services and Related Matters" <br />and except as ENGINEER may otherwise agree in writing. All of OWNER'S <br />instructions to CONTRACTORS will be issued through ENGINEER who will <br />have authority to act on behalf of OWNER to the extent provided in said <br />construction contract, except as otherwise provided in writing. <br /> <br />1.6.2. Visits to Site and Observation of Construction. In connection <br />with observations of the work of CONTRACTOR(S) while it is in progress: <br /> <br />1.6.2.1. ENGINEER shall make visits to the site at intervals <br />appropriate to the various stages of construction as ENGINEER deems <br />necessary in order to observe as an experienced and qualified design <br />professional the progress and quality of the various aspects of the <br /> <br />Page 3 of 17 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.