Laserfiche WebLink
Item No. 9 <br />Code Enforcement Report: September, 2020 <br />Cases Worked: 359 <br />Cases Completed: 341 <br />Initial Inspections: 351 <br />Re -inspections: 591 <br />Total Inspections: 942 <br />Lots Abated: 186 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 4 days <br />Removed Tires — 3 days <br />Removed Illegal Dumps — 6 days <br />Repaired/Serviced Equipment — 2 days <br />Buildinj_And Standards Report: September 2020 <br />There was no BSC Meeting in September.. <br />1 Structure was demolished: <br />2004 Cleveland <br />