Laserfiche WebLink
HAYTER <br />E N G I N E E R I N G <br />November 4, 2020 <br />Mr. Grayson Path, City Manager <br />City of Paris <br />135 SE 1" Street <br />Paris, TX 75460 <br />RE: 645 Johnson woods Drive Channel Bank Stabilization <br />HEI #180078 <br />Dear Mr. Path: <br />Regarding the above referenced project, bids were received on October 1, 2020. Five bids were <br />received. All bids were opened and found to be responsive. Attached is the Bid Tabulation. The <br />low bidder is Bernal Commercial Construction Co. in the base bid amount of $56,985.00. <br />We have verified the completeness of the bid and have verified that the bonding company is <br />licensed in Texas. The bid appears to conform to the contract document requirements. Based on <br />a review of the Statement of Bidder's Qualifications, we believe them to be responsive and <br />responsible. <br />We therefore recommend award of this project to Bernal Commercial Construction Co. in the base <br />bid amount of $56,985.00. If the City concurs with this recommendation, please sign the attached <br />three original Notice of Award forms. Upon signing, please return all three originals to this office <br />for initiating the contract execution process. <br />Sincerely, <br />HAYTER ENGINEERING, INC.®is OF <br />. T <br />............ <br />a HRISTOPHER M. D .. <br />Christopher M. Donn i <br />an, P.E. °4-�': 9072x3 <br />Project Manager <br />Enclosure <br />Practical Infrastructure <br />4445 SE Loop 286 I Paris, T <br />X 75460 i haytereng.co <br />31i1 i.. G k Isra�., `.0 r 1[ <br />