My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 - Utility Bond Project - Package 4 Third Party Engineering Audit
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
11 - NOVEMBER
>
November 9
>
26 - Utility Bond Project - Package 4 Third Party Engineering Audit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 11:48:31 AM
Creation date
11/5/2020 11:48:05 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTIHII IIII'' !U111]IEIRIN4 1'" !OIZOJECI` <br />---------------- <br />An environmental assessment of the project impacts was performed, and key project features and <br />construction sequencing were incorporated into the design and construction to minimize impacts. <br />These included locations for critical pedestrian crossings, requirements for maintaining access <br />to neighborhoods and businesses, and maintaining traffic on 156th Street during construction. <br />Improvements to the stormwater drainage system was also included to reduce ongoing erosion and <br />Watip.[ dpnra Midri r♦h Pi illion Creek that carries all storm water runoff from the <br />♦INIHOV44" - I I <br />I; mmktf�q Honw)"t 1 01#114 <br />surveying, public outreach, utility coordination and design, roadway and storm sewer design, right <br />n,J Jiiiin, and, struction administration and egineerinw. The selected desi n <br />Iii illi iii Willi MONNi - i <br />I WINILT1740,10M 1&1494,lq I tip 11 N VJ]L1JTr*M MAP] llc4mlit4wllmoilmpL#IILIrLoamplIL4]174174LqlTr4 <br />W =11 01 *HAI <br />M -11111111101011,11111M WIN 1 IRWIN <br />0 0 o -$Ao A 0 ..9 <br />-- — ----- ------- <br />A traffic study was completed to determine necessary improvements to increase traffic flow and <br />improve lane geometry. The recommendations included installation of dual right -turn lanes from <br />Dougherty Road on to Whisky Road, as well as roadway widening, new concrete medians, new curb <br />ilk I W, 1� - "Odmaii "1 -1 . . ... # <br />WMIN 11111110111ffi111 1, 1 11 * r - <br />NEBRASKA AVENUE, 4TH TO 14TH STREET I CITY OF YORK, NE <br />Nebraska Avenue was an urban roadway experiencing a high frequency of flooding due to an <br />undersized storm sewer trunk line capturing stormwater from a significant area of the City and <br />4-. X W 4: LF box <br />culvert directly under a widened pavement section. New water mains, water services, and sanitary <br />sewer mains were constructed due to conflicts with the new box culvert. The corridor was a mix of <br />residential, commercial businesses, churches and City Public Facilities. Because many properties <br />were accessible via a parallel alley system, the project was constructed under a full closure, a <br />few blocks at a time. Benesch provided construction services including project management, field <br />i# rnnrdit,?finn obsery <br />DISPUTE RESOLUTION I COLORADO DEPARTMENT OF TRANSPORTATION <br />The Colorado Department of Transportation (CDOT) asked Benesch to assist on a project as an <br />iAc1e#eAd.eAt tMni t* 4vid.e ixsig%t iAt**xtracttr. Be.tescx's r*le <br />4 Q I 1rit <br />findings to the Dispute Resolution Board (an informal/non-binding arbitration process). <br />
The URL can be used to link to this page
Your browser does not support the video tag.