My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-094-RES WHEREAS, LAKE CROOK DAM HAS BEEN NOTED AS DEFICIENT IN INSPECTION BY TEXAS WATER
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1989
>
1989-094-RES WHEREAS, LAKE CROOK DAM HAS BEEN NOTED AS DEFICIENT IN INSPECTION BY TEXAS WATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:33:57 PM
Creation date
4/14/2005 6:44:31 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1989
Doc Type
Resolution
CITY CLERK - Date
8/10/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />- <br />- <br /> <br />.,' <br /> <br /> <br />structure, please refer to the photographs, Exhibit "0" <br />herein. <br />It is respectfully recommended that immediate <br />improvements be initiated to correct the defects and <br />alleviate further deterioration of the structure <br />surfaces and reinforcing elements. These repairs would <br />include the thorough sand-blasting and cleaning of the <br />surfaces to be capped or grouted. Following <br />satisfactory preparation of the surfaces, an epoxy type <br />gout mixture would be applied. <br />It should be mentioned here that the above <br />corrections require the lowering of the normal pool <br />elevation the reservoir approximately 3 feet, to <br />elevation 473.00, to facilitate dry conditions on the <br />spillway surfaces as well as lower surfaces of the <br />embankment slope protection. The construction cost <br />estimate herein is based on the city personnel lowering <br />the reservoir level by utilizing temporary siphons or <br />the existing raw water pumps. Close coordination <br />between the city and construction contractor will be <br />required. It is further recommended that the design, <br />bidding and construction phases be scheduled around the <br />yearly dry season (summer months) to allow expedient <br />construction during dry conditions and to assure as <br />little fluctuation of reservoir water levels as <br />possible. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.