My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-094-RES WHEREAS, LAKE CROOK DAM HAS BEEN NOTED AS DEFICIENT IN INSPECTION BY TEXAS WATER
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1989
>
1989-094-RES WHEREAS, LAKE CROOK DAM HAS BEEN NOTED AS DEFICIENT IN INSPECTION BY TEXAS WATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:33:57 PM
Creation date
4/14/2005 6:44:31 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1989
Doc Type
Resolution
CITY CLERK - Date
8/10/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br />- <br />I <br /> <br />TABLE 1 <br /> <br />CONSTRUCTION COST ESTIMATE <br /> <br />CONCRETE RIP-RAP AND SPILLWAY REHABILITATION <br />LAKE CROOK DAM <br /> <br /> <br />CITY OF PARIS, TEXAS <br />MAY 1989 <br /> <br />1. Existing concrete rip-rap <br /> removal and disposal <br /> 22 panels @$2.59 cy 67 cy-L.S. = $ 7,000.00 <br />2. Prepare embankment face <br /> and install soil-cement <br /> fill L.S. = $ 3,500.00 <br />3. Install new concrete <br /> rip-rap panels - <br /> 22 panels @$2.59 cy 67 cy @$400 = $26,800.00 <br />4. Sand-blast and prepare <br /> spillway surfaces for new <br /> grout application L.S. = $ 4,000.00 <br />5. Apply new grout; <br /> surfacing and fill to <br /> spillway structure L.S. = $ 4.000.00 <br /> Total Estimated Construction Cost $45,300.00 <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.