Laserfiche WebLink
<br />- <br />- <br />I <br /> <br />TABLE 1 <br /> <br />CONSTRUCTION COST ESTIMATE <br /> <br />CONCRETE RIP-RAP AND SPILLWAY REHABILITATION <br />LAKE CROOK DAM <br /> <br /> <br />CITY OF PARIS, TEXAS <br />MAY 1989 <br /> <br />1. Existing concrete rip-rap <br /> removal and disposal <br /> 22 panels @$2.59 cy 67 cy-L.S. = $ 7,000.00 <br />2. Prepare embankment face <br /> and install soil-cement <br /> fill L.S. = $ 3,500.00 <br />3. Install new concrete <br /> rip-rap panels - <br /> 22 panels @$2.59 cy 67 cy @$400 = $26,800.00 <br />4. Sand-blast and prepare <br /> spillway surfaces for new <br /> grout application L.S. = $ 4,000.00 <br />5. Apply new grout; <br /> surfacing and fill to <br /> spillway structure L.S. = $ 4.000.00 <br /> Total Estimated Construction Cost $45,300.00 <br /> <br />13 <br />