Laserfiche WebLink
<br />. <br /> <br />CHANGE ORDER <br /> <br />. <br /> <br />No, <br /> <br />1 & Final <br /> <br />(Instructions on reverse side) <br /> <br />PROJECT: Replacement Force Main for <br />Campbell's Lift Station <br />OWNER: <br /> <br />(Name. City of Pari s <br />Address) Pari s, Texas 75460-9037 <br /> <br />DATE OF ISSUANCE: <br /> <br />CONTRACTOR: Bill Hazelwood, I nc . <br /> <br />OWNER's Project No. <br /> <br />88-WSRB-06-89. <br /> <br />CONTRACT FOR: <br /> <br />ENGINEER: Earl Smith, P.E. <br />City Engineer <br />City of Paris <br />89.02 <br /> <br />ENGINEER's Project No, <br /> <br />You are directed to make the following changes in the Contract Documents. <br /> <br />Description: <br /> <br />1'1Irpose of Change Order: The State Department of Highways and Publ ic Transportation required <br />a longer bore and casing than was designed and bid. An extra fitting and 41 feet of pipe <br />were necessary also to bring the pipeline back into alignment after meeting the State's <br />.'.-tffteltmeftlo! EListlleB_BRlss"I'pafliBgekBRllol requirement, Twenty-five (25) feet of concrete <br />encasement (as designed) was not needed and was deducted from the total price. <br /> <br />CHANGE IN CONTRACT PRICE: <br /> <br />CHANGE IN CONTRACT TIME: <br /> <br />Original Contract Price <br /> <br />Original Contract Time <br /> <br />$ <br /> <br />25,528.90 <br /> <br />45 days <br />days or datc <br /> <br />Previous Change Orders No, <br /> <br />to No, <br /> <br />Net change from previous Change Orders <br /> <br />$ <br /> <br />da,., <br /> <br />Contract Price prior to this Change Order <br /> <br />Contract Time Prior to this Change Order <br /> <br />45 days <br /> <br />$ 25.528 . 90 <br /> <br />days or datc <br /> <br />Net Increase 1.16~) of this Change Order <br /> <br />Net Increase (decrease) of this Change Order <br /> <br />3,664.93 <br /> <br />o <br />day. <br /> <br />$ <br /> <br />Contract Price with all approved Change Orders <br /> <br />Contract Time with all approved Change Orders <br /> <br />$ <br /> <br />29,192.93 <br /> <br />45 days <br /> <br />da)'sordatc <br /> <br />RECOMMENDED: <br /> <br />APPROVED: <br />CITY OF PARIS, PARIS, TX <br /> <br />APPROVED: <br /> <br />by <br /> <br />Ena;_ <br /> <br />by by <br />Curtis F~ley, Mayor Pro Tern <br />OWNER <br /> <br />Con,,,,,,,, <br /> <br />ATTEST: <br /> <br />Mattie Cunningham, City Clerk <br /> <br />EXHIBIT A <br />