Laserfiche WebLink
Item No. 9 <br />Code Enforcement Report:October & November 2020 <br />Cases Worked: 462 <br />Cases Completed: 778 <br />Initial Inspections: 390 <br />Re -inspections: 726 <br />Total Inspections: 896 <br />Lots Abated: 156 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal —10 days <br />Removed Tires — 6 days <br />Removed Illegal Dumps -10 days <br />Repaired/Serviced Equipment — 4 days <br />8 structures were presented to the Building and Standards Commission in November: <br />503 & 519 Tudor 720 NE 2nd <br />636 NE 2nd 1311 Hickory <br />Building and Standards Report: October & Novembers 2020 <br />18 structures were presented to the Building and Standards Commission in October: <br />520 Deshong <br />1231 Martin Luther King Jr. <br />1021 NE 8th <br />265 NE 22nd <br />643 Cedar <br />-1257 E Sherman <br />1239 E Sherman <br />337 E Washington <br />343 Brown <br />346 NW 3rd <br />646 NW 5th <br />534 NW 5th <br />1321 NW 18th <br />1716 W Campbell <br />1365 Graham <br />1334 W Booth <br />2605 W Houston <br />260 S Main <br />8 structures were presented to the Building and Standards Commission in November: <br />503 & 519 Tudor 720 NE 2nd <br />636 NE 2nd 1311 Hickory <br />