My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - Secondary Interim City Engineer Services Agreemetn with KSA Engineers
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
10 - Secondary Interim City Engineer Services Agreemetn with KSA Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:02:25 AM
Creation date
12/10/2020 9:47:46 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 10 <br />Vff"I "I � %, I In''Ay , I,, <br />TO: Mayor & City Council <br />FROM: Grayson Path, City Manager <br />SUBJECT: Interim City Engineering Services <br />Secondary Service when Conflict of Interest exists with Primary Service <br />DATE: December 14, 2020 <br />At the November 9, 2020 City Council meeting, the City Council approved an agreement with <br />Hayter Engineering to serve as Interim City Engineer to address engineering -related issues, as <br />needed. Such issues include Preliminary Plat review, Final Plat review, subdivision regulation <br />consultation, utility/street in -the -field issues, etc., all as needed given City Staff are taking on as <br />much as possible and to minimize expense. This relationship will exist until a new City Engineer <br />is hired. <br />When working with a local engineering firm, there is inevitably a time when a conflict of interest <br />will occur. The primary example will be when a developer has approached Hayter Engineering to <br />perform design or surveying duties. Hayter Engineering then cannot assist the City to review these <br />documents, requiring the City to seek out a secondary engineering service for those situations. <br />One such conflict of interest has already arisen which pre -dates the City Manager approaching <br />Hayter Engineering about this Interim service. A secondary firm will be needed to review the <br />material created by Hayter Engineering for their client. Although working with a local firm is <br />most advantageous due to logistics, local knowledge and availability, and although conflicts of <br />interest are rare, conflicts of interest are still most likely to occur when working with a local firm. <br />STATUS OF ISSUE: <br />The City Manager has approached KSA Engineering of Longview, TX to serve in the role of <br />secondary Interim City Engineer when needed. The City has worked with KSA Engineering <br />before, the most recent project being SE 17th Street between Lamar Avenue and Clarksville. They <br />are a larger firm with multiple assets and resources similar to Hayter Engineering, so they will be <br />able to address the same issues stated above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.