My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 78 36 <br />A. This Section specifies general administrative and procedural requirements for warranties <br />and bonds required by the Contract Documents, including manufacturer's standard <br />warranties on products and special warranties. <br />1.02 DEFINITIONS: <br />A. Standard Product Warranties are pre-printed written warranties published by individual <br />manufacturers for particular products and are specifically endorsed by the manufacturer to <br />the OWNER. <br />B. Special Warranties are written warranties required by or incorporated in the Contract <br />Documents, either to extend time limits provided by standard warranties or to provide <br />greater rights for the OWNER. <br />C. Standard Product Warranties and Special Warranties shall start on the date established <br />as the date of Substantial Completion. <br />o <br />A. Refer to Division 0 for Conditions of Contract for the general requirements relating to <br />warranties and bonds. <br />B. General closeout requirements are included in Section 01 70 00. <br />C. Specific requirements for warranties for the Work and products and installations that are <br />specified to be warranted are included in the individual Sections of Division 2 through 33. <br />D. Certifications and other commitments and agreements for continuing services to OWNER <br />are specified elsewhere in the Contract Documents. <br />1.04 SUBMITTALS: <br />A. Submit written warranties to the OWNER prior to the date fixed by the ENGINEER for <br />Substantial Completion. If the Certificate of Substantial Completion designates a <br />commencement date for warranties other than the date of Substantial Completion for the <br />Work, or a designated portion of the Work, submit written warranties upon request of the <br />OWNER. <br />B. When a designated portion of the Work is completed and occupied or used by the <br />OWNER, by separate agreement with the CONTRACTOR during the construction period, <br />submit properly executed warranties to the OWNER within fifteen days of completion of <br />that designated portion of the Work. <br />C. When a special warranty is required to be executed by the CONTRACTOR, or the <br />CONTRACTOR and a subcontractor, supplier or manufacturer, prepare a written <br />document that contains appropriate terms and identification, ready for execution by the <br />required parties. Submit a draft to the ENGINEER for acceptance prior to final execution. <br />D. Refer to individual Sections of Divisions 2 through 33 for specific content requirements, <br />and particular requirements for submittal of special warranties. <br />E. At Final Completion, compile two copies of each required warranty and bond properly <br />executed by the CONTRACTOR, or by the CONTRACTOR, subcontractor, supplier, or <br />manufacturer. Organize the warranty documents into an orderly sequence based on the <br />table of contents of the Contract Documents. <br />City of Paris, Texas 00 78 36 — Page 1 of 2 Warranties and Bonds <br />9/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.