Laserfiche WebLink
I "Or -Equal Items If in ENGINEER's sole discretion an item <br />ofruterhal or equipment propocedby CONTRACTOR is functionally equal <br />to that named and suH'icientlysimtlar so that no change in relaled Work will <br />be requued, it may be considered by ENGINEER as an "or -equal" iters, in <br />which case review and approval ofthe proposed item may, in ENGINEER's <br />sole discretion, be accomplished without compliance with some or all ofthe <br />requirctrients for approval of proposed substitute items For the purposes of <br />this paragraph 6 05,.11, a proposed item of material or equipment will be <br />considered functionally equal to an item so named if. <br />a to the exercise of reasonable judgment ENGINEER <br />determines that. fit it is at least equal in quality, durability, <br />appearance, strength, and design characteristics, (it) it will reliably <br />perform at least equally well the function imposed by the design <br />concept of the completed Project as a functioning whole, and, <br />b CONTRACTOR certifies that: (i) there is no increase in <br />cost to the OWNER; and (ii) it will conform substantially, even with <br />deviations, to the detailed requirements of the item named in lite <br />Contract DocumenLs <br />2 Substitute Items <br />a If in ENGINEER's sole discretion an item of malerial or <br />equipment proposed by CONTRACTOR does not quatify as an <br />..or -equal" item under paragraph 6 05 A. 1, it will be considered a <br />proposed substitute item <br />b. CONTRACTOR shall submit sufficient information as <br />provided below to allow ENGINEER to determine that the item of <br />material or equipment proposed is essentially equivalent to that named <br />and an aLcc-ptablu substitute therefor Requests for review of proposed <br />substitute item of material or equipment will not be accepted by <br />ENGINEER from anyone other than CONTRACTOR. <br />c The procedure for review by ENGINEER will be as set <br />forth in paragraph 6.05.A.2.d, as supplemceted in the General <br />Requiranerrls and as ENGINEER may decide is appropriate under the <br />circumstances. <br />d. CONTRACTOR shall fust make written application to <br />ENGINEER for review of a proposed substitute item of material or <br />equipment that CONTRACTOR seeks to furnish or use. The <br />application shall certify that the proposed substitute item will perform <br />adequately the flinclions and achieve the results called for by the <br />general design, be similar in substance to that specified, and be suited <br />to the same use as that specified The application will slate the extent, <br />if any, to which the use ofthe proposed substitute item will prejudice <br />CONTRACTOR'S achievement of Substantial Completion on time, <br />whether anon use of& proposed substitute item in the Work will re- <br />quire a change in any of the Contract Documents (or in the provisions <br />of any other direct contract with OWNER for work on the Project) to <br />adapt the design to the proposed substitute item and whether or not <br />incorporation or use ofthe proposed substitute item lir connection with <br />the Work is subject to payment of any license fee or royalty All <br />variations ofthe proposed substitute item from that specified will be <br />identified in the application, and available engineering, sales, <br />maudcuncz, repair, and replacement services will be indicated, The <br />application will also contain an itemized estinWz of all [rids or credits <br />that will result directly or indirectly from use of such substitute item, <br />including costs ofredesign and claims ofother contractors affected by <br />any rh9rlling change, all ofwhich will be considered by ENGINEER <br />in evaluating the proposed substitute item. ENGINEER may require <br />CONTRACTOR to furnish additional data about the proposed <br />substitute iters <br />B Substitute CowtmctionMethods or Procedures- If a specific means, <br />method, tecitniquq sequence, or procedure of construction is shown or indicated <br />in and expressly required by thu Contract Documents, CONTRACTOR may <br />fumish or utilize a substitute means, method, terhnique, sequence, or procedure <br />of construction approved by ENGINEER CONTRACTOR shall submit <br />sufficed information to allow ENGINEER, in ENGINEER's sole discretion, to <br />determine that the substitute proposed is equivalent to that expressly called for <br />by the Contract Documents, The procedure for review by ENGINEER will be <br />similar to that provided in subparagraph 6-05,A.2, <br />C Eng,neer's Evaluation, ENGINEER will be allowed a reasonable <br />time within wfuch to evaluate each proposal or submittal made pursuant to para- <br />graphs 6.05.A and 6 05.B. ENGINEER will be Ihesolejudge of acceptability <br />No 'or -equal" or suhsliluta will be ordered, installed or utilized until <br />F.NGINRER's review is complete, which will be evidenced by either a Change <br />Order for a substitute or an approved Shop Draining for an "or equal " <br />ENGINEER will advise CONTRACTOR in writing of any negative <br />determination <br />D Special Guarantee: OWNER may require CONTRACTOR to <br />furnish at CONTRAC rOR's expense a special performance guarantee or other <br />surety with respect to any substitute. <br />E ENGINEER's Cost Reimbursement ENGINEER will record time <br />required by ENGINEER and ENGINEER's Consultants in evalttating substitute <br />proposed orsubmitted by CONTRACTOR pursuant to paragraphs 6.05A.2 and <br />6 05,8 and in making changes in the Contract Documents (or in the provisions <br />of any other direct contract with OWNER for work on the Project) occasioned <br />thetebv Whetter or not ENGINEER approves a substitute item so proposed or <br />submitted by CONTRACTOR, CONTR.' C1OR shall reimburse OWNER for <br />the charges of ENGINEER and ENGINEER's Consultants for evaluating each <br />such proposed substitute <br />F C0NTR,4CTOR's Expense CONTRACTOR shall provide all data <br />in support of any proposed substitute or "or -equal" at CONTRACTOR's <br />expense <br />606 Concerning Subcontractors, Suppliers, and Others <br />A CONTRACTOR shall not employ any Subcontractor, Supplier, or <br />other individual or entity (including those acceptable to OWNER as indicated <br />in paragraph 6,06.8), whether initially or as a replacement, against whom <br />OWNER may have reasonable objection CONTRACTOR shall not be required <br />to employ any Subcontractor, Supplier or other individual or entity to furnish <br />or perform any of the Work against whom CONTRACTOR has reasonable <br />objection <br />B If the Supplementary Conditions require the identity of certain <br />Subcontractors, Suppliers, or other individuals or entities to be submitted to <br />OWNER in advarm for acceptance by OWNER by a specified dale prior to the <br />Effective Date ofthe Agreement, and if CONTRACTOR has submitted a list <br />Ilhereofin accordance with the Supplementary Conditions, OWNER's acceptance <br />(either in writing or by failing to make written objection thereto by the date <br />indicated for acceptance or objection in the Bidding Documents or the Contract <br />Doaurezils) of any such Subcontractor. Supplier, or other individual or entity so <br />identified may be revoked on the basis of reasonable objection after due <br />investigation CONTRACTOR shall submit an acceptable replacement for the <br />related Subcontractor, Supplier, or other individual or entity, and the Contract <br />Price will be adjusted by the diff rence in the cost occasioned by such <br />replacement, and an appropriate Change Order will be issued or Written <br />Amendment signed. No acceptance by OWNER of any such Suboon"dor, <br />Supplier, orot ervidividual or entity, whether initially or as a replacement, shall <br />constitute a waiver of any right of OWNER or ENGINEER to reject defective <br />Work. <br />C, CONTRACTOR shall be fully responsible to OWNER and <br />ENGINEER for all ads and omissions of the Subcontractors, Suppliers, and <br />other individuals or entities performing or furnishing any ofthe Work just as <br />CONTRACTOR is responsible for CONTRACTOR's own acts and omissions. <br />Nothing in the Contract Documents shall create for the benefit of any such <br />Suboitntraefor. Supplier, or oder individual or entity any conhac4tal relationship <br />between OWNER or ENGINEER and any such Subcontractor, Supplier or other <br />individual or entity, nor shall it create any obligalion on the part of OWNER or <br />ENGINEER to pay or to see to the payment of any moneys due any such <br />Subcontractor Supplier, or otber individual or entity except as may Mherwiso be <br />required by laws and Regulations. <br />D. CONTRACTOR shall be solely responsible for scheduling and <br />coordinating the Work of Subcontractors, Suppliers, and other individuals or <br />entities performing or furnishing any of the Work under a direct or indeed <br />contract with CONTRACTOR <br />E. CONTRACTOR sball require all Subcontractors. Suppliers, and such <br />other individuals or entities performing or furnishing any ofthe Work to commu- <br />nicate with ENGINEER through CONTRACTOR <br />F The divisions and sections ofthe Specifications and the identifications <br />ofany Drawing shall not control CONTRACTOR in dividing the Work among <br />Subcontractors or Suppliers or delineating the Work to be performed by any <br />specific trade. <br />00 72 00-13 <br />