3 other properly at the Site or adjacent thereto, including trees,
<br />shvubs, lawns. h,alks pavements, roadways, structures, utilities, and Under-
<br />ground Facilities not designated for removal, relncalion, or replacement on
<br />thL course of construction
<br />B CONTRACTOR shall comply with all applicable I..aws and
<br />Regulations relating to the safety of persons or property, or to the protect ion of
<br />p -now or property from damage., injury, or loss, and shall erect and maintain all
<br />necessary safeguards for such safety and protection CONTRACTOR shall
<br />notify owners of adjacent property and of Underground Facilities and other
<br />utility owners when prosecution of the Work may affect them, and shall
<br />enoperate with them in the protection, removal, relocation, and replacement of
<br />their property All damage, injury, or loss to any properly referred to in
<br />paragraph 6 13 A.2 or 6 13.x3 caused, directly or indirectly, in whole or in pari,
<br />by CON] RAM Olt, any Subcontractor, Supplier, or any other individual or
<br />entity duectly or indirectly employed by any ofthem to perform any or the Work,
<br />or anyone for whose acts any of them may be liable, shall be remedied by
<br />CONTRACTOR (exuyrt xattr b of f�iaNtrrjsbr
<br />Speei£rtai
<br />;^ormryene-cn*p{erg'c-r}-by`-mr3`of+hem-vr•-atz�no-foe.'
<br />V4.0 ftft 070fthem may be
<br />iiaele a>nd =ret'
<br />-irrpmi; rorxeegtigtr�ro�6i dTRAF'£9R-<rr-anp
<br />sNteerindirdnxd�vrertlrlS`dn�b��Y"�*'
<br />pinYal{+ytiutS�oftirtm) CONTRACTOR's duties and responsibilities for safcil
<br />and for protection of the Work shall continue until such tone as all the Work is
<br />completed and ENGINEER has issued a notice to OWNER and
<br />CONTRACTOR in ancordarim with paragraph 14 07 B that the Work is accept
<br />able (except as otherwise cxpressly provided in connection with Substantial
<br />Completion)
<br />614 SafetyRepresenraiwe
<br />A CONTRACTOR shall designate a qualified and experienced safety
<br />representative at the Site vbose duties and responsibilities shall be the prevention
<br />of accidents and the maintaining and supervising of safely precautions and
<br />programs
<br />6 15 Hazard Communication Programs
<br />A CONTRACTOR shall be responsible For coordinating any exchange
<br />of material safety data sheets or other hazard communication information
<br />required to be made available to or exchanged between or among employers at
<br />the Site in accordance with Laws or Regulations
<br />616 Emergencies
<br />A In emergencies a6ectrng the safety or protection of persons or the
<br />Work or property at the Site or adjacent thereto, CONTRACTOR is obligated
<br />to act to prevenl threatened damage, injury, or loss. CONTRACTOR shall give
<br />F.NGINFER prompt written notice if CONTRACTOR believes that any
<br />sagnifiearm changes in the Work or variations from the Contract Documents have
<br />been cm=d thereby or are required as a result thereof. If ENGINEER
<br />detenadri s that a change in the Contract Documents is required because ofthe
<br />action Laken by COMMACTOR in response to such an emergency, a Work
<br />Change Directive or Change Order will be issued,
<br />6.17 Shop Drawings and Samples
<br />A CONTRACTOR shall submit Shop Drawings to ENGINEER for
<br />review and approval in accordance with the acceptable schedule of Shop
<br />Drawings and Sample submittals. All submittals will be identified as ENGI-
<br />NEER may require and inthenumber ofccpies specified in the General Require-
<br />merft 11m data shown on the Shop Drawings will be complete with respect to
<br />quiantiliez dimeasions. specified performance and design criteria, materials, and
<br />similar data to show ENGINEER the services, materials, and equipment
<br />CONTRACTOR proposes to provide and to enable ENGINEER to review the
<br />information for the limited purposes required by paragraph 6.17.E.
<br />B. CONTRACTOR shall also submit Samples to ENGINEER for review
<br />and approval in accordance with the acceptable schedule of Shap Drawings and
<br />Sample submittals„ Each Sample will be identified clearly as to material.
<br />Supplier, pertinent data such as catalog numbers, and the use for which intended
<br />and otherwine as ENGINEER may require to enable ENGINEER to review the
<br />submittal for the limited purposes required by paragraph 6.17. E, The numbers
<br />of each Sample to be submitted will be as specified in the Specifications.
<br />C, Where a Shop Drawing or Sample is tequircd by the Contract
<br />Docurowborlbesebedule ofShop Drawings and Sample submittals acceptable
<br />to ENGINEER as required hyparagraph 2 07, any related Work performed prior
<br />to ENGINEER's review and approval ofthe perturcni submittal will be at the
<br />sole expense and responsibility of CONI RAM OR
<br />D Submrital Procedures
<br />I Before submitting each Shop Drawing (.ir Sample,
<br />CONTRACTOR shall have detemnned and verified
<br />a all field measurements, quantities, dimensions, Specified
<br />performance cnteria, installation requirements, materials, catalog
<br />numbers, and similar information with respect thereto,
<br />b all materials with respect to intended use, fabrication
<br />shipping, handling; storage, assembly, and installation pertaining to
<br />the performance ofihe Work;
<br />c. all information relative to means, methods, techniques,
<br />sequeriem and proocdures of construction and safety precautions and
<br />programs incident thereto, and
<br />d CONTRACFORsihall also have reviewed and coordinated
<br />each Shop Drawing or Sample with other Shop Drawings and Samples
<br />and with the requirements ofthe Work and the Contract Documents
<br />2. Each submittal shall bear a stamp or specific written indication
<br />Out CON=TRACTOR has satisfied CONTR ACTOR's obligations under the
<br />Com is with respect. to CONTRACTOR's review and approval
<br />of that submittal
<br />3. At the time of each submittal, CONTRACTOR shall give
<br />ENGINEER sTtacific written notice of such variations, if any, that the Shop
<br />Drawing or Sample submitted may have from the requirements of the
<br />Coiatrad Documents, such notice to be in a written communication separate
<br />from the submittal; and, in addition, shall cause a speck notation to be
<br />made on each Shop Drawing and Sample submitted to ENGINEER for
<br />review and approval of each such variation
<br />E ENGINM'sReview
<br />I. ENGINEER will timely review and approve Shop Drawings and
<br />Samples in accordance with the schedule of Shop Drawings and Sample
<br />submidalsancepiableto ENGINEER. ENGINEER's review and approval
<br />will be only to determine if the items covered by the submittals will, ager
<br />istallabion or incorporation in the Work, conform to the information given
<br />in the Contract DocumesiLs and be compatihlc with the design concept of the
<br />completed Project as a lunctioningwhole as indicated by the Contract Docu-
<br />ments.
<br />2. ENGINEER's review and approval will not extend to means,
<br />techniques, sequences, or procedures of construction (except where
<br />a particular means, method, techruquc, sequence, or procedure of con-
<br />struction is specifically and expressly called for by the Contract Documents)
<br />or to safety precautions or programs incident thereto. The review and
<br />approval of a separate item as such will not indicate approval of the
<br />assembly in which the item functions,
<br />3. ENGINEER's review and approval of Shop Drawings or
<br />Samples shall not relieve CONTRACTOR from responsibility for any
<br />variation from the requirements of the Contract. Documents unless
<br />CONTRACTrORhas in wrKing called ENGINEER's attention to each such
<br />variation at the lime of each submittal as required by paragraph 6.17.1) 3
<br />and ENGINEER has given writlen approval of each such variation by
<br />specific written notation thereof incorporated in or accompanying the Shop
<br />Drawing or Samplc approval; nor will any approval by ENGINEER relieve
<br />CONTRACTOR from responsibility for complying with the requirements
<br />ofparagraph 6.17.D.1,
<br />R Resubmittal Procedures
<br />1. CONTRACTOR shall make corrections required by
<br />ENGINEER and shall return the required number of corrected copies of
<br />Shop Drawings and submit as required new Samples For review and
<br />approval,. CONTRACTOR shall direct specific attention in writing to
<br />revisions other than the correction called for by ENGINEER on priavious
<br />submittals
<br />6.19 Continuing the Work
<br />00 72 00- 15
<br />
|