Laserfiche WebLink
<br />PRO RATA WATER LI~E EXTENSION BETHEL TEMPLE, S.E. LOOP 286 <br /> <br />Based on the front foot rule, the estimated costs for the project <br />are as follows: <br /> <br />THOMAS (850') $11,071.89 ) <br /> ) $40,094.64 max. returnab le to <br />EDZARDS (2,228' ) $29,022.75 ) church if they put <br /> up only $42,567.83 <br /> of the total proj. <br />BETHEL (190' ) $ 2,473.19 cost ($59,330.80) <br />TEMPLE <br />6" Line $42,567.83 <br />8" Line $59,33-0.80 <br />Upsizing Cost $16,762.97 <br /> <br />EXHIBIT A <br />